新建南通至启东铁路施工总工期方案比选

来源 :铁路工程造价管理 | 被引量 : 0次 | 上传用户:kingly1988
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
施工组织设计是指导工程建设的重要技术经济文件,合理确定施工组织方案和总工期是施工组织设计的核心,也是确定工程投资和合理安排工程建设的重要条件。此文根据铁建设[2009]226号《铁路工程施工组织设计指南》,结合新建铁路宁启线南通至启东工程实践,分析研究主要施工组织方案及施工总工期方案。 The construction organization design is an important technical and economic document that guides the construction of the project. It is the core of the construction organization design to reasonably determine the construction organization plan and the total construction period, and also an important condition for determining the project investment and reasonably arranging the construction of the project. According to Railway Construction Construction Design Guidebook No. 226 [2009], combined with the practice of Nantong-Qidong project of Ningqi Line of newly built railway, this paper analyzes and studies the main construction organization plan and total construction duration plan.
其他文献
颞下颌关节紊乱病(TMD)是口腔科常见多发病,是由于颞下颌关节、关节周围肌肉、神经之间功能失调引起的一种功能障碍性疾病。自2004年以来,我们采用超短波治疗TMD,取得了较好疗效。
2016年11月9日,经过近25h昼夜奋战,武汉杨泗港长江大桥2号桥塔沉井最后一次封底顺利完成(见图1)。至此,2号桥塔沉井完成全部封底施工,并坐稳根基,即将转入承台施工。
东沙颖河大桥为部分预应力混凝土组合箱梁桥,设计荷载为汽-超20,挂-120°某不可拆分的专用大件电力设备(车货总重644.5t)运输途经该桥,为确保车辆过桥时结构安全,采用装配式公路