无锡500kV梅里变电站工程的道路工程面积约14000m2,包括宽6m、长225m的主干道1条,每条长为150m的次干道10条。道路严格按照施工图纸和施工验收规范的要求进行施工,每4m设置1条缩缝,每20m设置1条宽2.5cm的伸缝。施工完成后的道路路面观感良好,平整度控制在要求的范围之内。1伸缝
The road construction area of Wuxi 500kV Meri Substation Project is about 14000m2, including 1 main road with a width of 6m and a length of 225m, and 10 sub-main roads with a length of 150m each. The roads shall be constructed in strict accordance with the requirements of construction drawings and construction acceptance standards, one set of shrinkage shall be provided every 4m and one set of 2.5cm wide slit shall be set up every 20m. After the construction of the road pavement feel good, flatness control within the required range. 1 Stretch