水稻为淮河下游主要秋季作物,在排水工程規划設計中,首先碰到了水稻田的排水設計流量計算問題,过去实测流量太少,加上水稻田的出水量与降雨量的关系与旱地不同,因此水稻田之出水量很难自实測流量資料中分析而得,也不能机械地借用附近旱地降雨与徑流关系及其計算流量的方法。苏联水稻田泄水網的任务(見考斯加可夫土壤改良原理第二篇第五章四節)主要有二:
Rice is the main autumn crop in the lower reaches of the Huaihe River. In the planning and design of drainage projects, the calculation of the discharge design flow of the paddy fields was first encountered. In the past, the measured flow rate was too small. In addition, the relationship between the output of the paddy fields and rainfall was different from that of the dry land The output of paddy field is difficult to obtain from the measured flow data, and it is also impossible to mechanically borrow the method of calculating the relationship between rainfall and runoff in the dry land nearby and calculating the flow rate. The task of the USSR paddy field drainage network (see Cowesagafe Soil Improvement Principles, Chapter II, Chapter IV) There are two main: