论文部分内容阅读
业主作为工程投资方,其对工程建设的目标是在保证工程质量安全满足要求的情况下,实现产出投入比最大化。除了在前期设计阶段采用性价比高的建筑方案外,还必须加强工程施工过程中现场签证的管理。双管齐下才能有效控制投资,实现效益最大化。本文在分析总结工程现场签证存在的问题的基础上,就业主如何加强工程现场签证管理提出了一些可行性建议。
As a project investor, the owner of the project aims at maximizing the input-output ratio while ensuring the quality and safety of the project meets the requirements. In addition to the cost-effective construction program in the early design stage, it is also necessary to strengthen the management of on-site visas during construction. A two-pronged approach can effectively control investment and maximize benefits. Based on the analysis of the problems existing in the project site visa, this paper puts forward some feasible suggestions on how to strengthen the management of the project site visa.