徐水县瀑河大年山水庫,原系灌溉水庫,于今春水利高潮时开始动工修建。目前,由于农業生产大躍进和地方工業大躍进对电力提出了迫切的要求,为充分利用瀑河水庫的灌溉水量,和由土埧已經造成落差的有利条件,在渠道上修建水电站,以供給附近农村抽水灌溉、农产品加工和照明用电。电站設計时,水庫已經动工,因此电站的設計是在已成或正在建筑的工程(全部工程除电站樞紐外,包括土埧、輸水洞和溢
Xu River County waterfall River Dashan Reservoir, the original irrigation reservoirs, started in the spring of this year, the climax of water began construction. At present, due to the urgent need of the Great Leap Forward in Agricultural Production and the Great Industrial Leap Forward, in order to make full use of the amount of irrigation water in Bohe Reservoir and the favorable conditions that have caused the fall by Tujia, the construction of hydropower stations in the channels, To supply nearby rural irrigation, agricultural products processing and lighting electricity. As the power station is being designed, the reservoir has been started. Therefore, the design of the power station is a project that has already been or is under construction (all projects except for the power station hub, including soil, water tunnel and overflow