论文部分内容阅读
华东地区建筑标准设计协作组于1974年6月18~27日,在安微黄山召开了工业废水处理经验交流会。会议交流了废水综合利用和处理的科研成果,设计和计算方法,以及生产运用等方面的经验。会议认为,要搞好废水综合利用和处理,必须认真贯彻关于“一切所建、扩建和改建的企业,防治污染项目,必须和主体工程同时设计,同时施工, 同时投产”的精
In June 18th to 27th, 1974, the Building Standards Design Cooperation Group of East China held an experience exchange meeting for industrial wastewater treatment in Huangshan, Anhui Province. The meeting exchanged experiences in the scientific research results, design and calculation methods, and production and utilization of wastewater comprehensive utilization and treatment. The meeting held that in order to do a good job in the comprehensive utilization and treatment of wastewater, we must conscientiously implement the principle that all enterprises established, expanded and reconstructed, and pollution prevention and control projects must be designed, constructed, and put into production at the same time as the main project.