在国家“七五”重点攻关项目“三峡混凝土快速施工研究”(16-4-4)的研究过程中,对高峰年强度和高峰月强度的估计,通过运输、浇筑系统仿真的方法得出了一个期望值。二期工程高峰年强度将达410万m~3,高峰月强度达46万m~3。这是超世界水平的工程。但由于系统仿真时混凝土的浅筑顺序是随机选取的,即使采用了人机对话给予专家经验的指导,也不能达到理论上的最优排序。因此系统仿真取得的数据只能作为论证工程可行性报告的参考。
During the research on key projects of the National Seventh Five-Year Plan and the Research on Rapid Construction of the Three Gorges Project (16-4-4), the annual peak intensity and the peak monthly intensity were estimated by means of transportation and pouring system simulation The method yields an expectation. The peak intensity of the second phase project will reach 4.1 million m 3 and the monthly peak intensity will reach 460,000 m 3. This is a world-class project. However, because the order of shallow construction of concrete is randomly selected in the system simulation, the theoretical optimal ranking can not be achieved even if the guidance of expert experience is adopted in the man-machine dialogue. Therefore, the data obtained by system simulation can only serve as a reference for demonstrating the project feasibility report.