卫77-23井是中原石油勘探局在东濮凹陷中央隆起带北部造卫77区块的一口开发井,设计井深2989米,完钻井深2989米。该井在钻遇井深2850米处发生井漏,井口不返。使用大量的堵漏剂和水泥浆进行反复堵漏,历时一个月都未能成功共漏失钻井液700余方,经过开发部和采油厂反复考证,钻机往西移出10米再打一个新井眼。结果在钻至井深2852米处又发生漏失,又使用大量的堵漏剂和水泥浆进行反复堵漏,共漏失钻井液1398.2方。使用两个凡尔钻进历时2个月终于完钻。针对该井在井底漏失,各项固井措施落实困难等固井中存在的技术难题,通过对水泥浆体系和隔离液液的反复优选和评价,固井施工工艺的研究和论证,固井质量良好,为此类井开发提供了技术支持。
Wei 77-23 well is a development well of Block 77 of the Central Uplift Belt of Dongpu Depression of Central Plains Petroleum Exploration Bureau with a design depth of 2989 meters and a drilling depth of 2989 meters. The well drilled well at a depth of 2850 meters, wellhead did not return. Using a large number of plugging agent and grouting for repeated plugging, which lasted a month failed to successfully drain more than 700 square footage of drilling fluid, after repeated research and development of the oil production plant drilling rig to move west 10 meters and then hit a new hole. As a result, leakage occurred again at the drilling depth of 2852 meters and a large amount of plugging agent and cement slurry were used for repeated plugging, totally 1398.2 of drilling fluid was lost. The use of two two-ear drilling lasted two months and finally finished drilling. According to the technical problems of well cementing, such as the loss of the well at the bottom of the well, the difficulty of implementation of various cementing measures, etc., the optimization and evaluation of cement slurry system and isolation liquid, the research and demonstration of cementing construction technology, Good, provided technical support for such well development.