论文部分内容阅读
在重重困难面前百折不挠,在道道难关面前决不退缩,“江苏中信人”做到了。阿尔及利亚大清真寺—建筑面积43万平方米、地上268米、地下四层(世界上第三大清真寺,阿国第一大清真寺)创建于1977年的江苏中信建设集团有限公司(以下简称江苏中信),历经36年风雨兼程,逐步从小到大、由弱到强,成为集房屋建筑、市政公用、建筑装修装饰、钢结构、地基与基础、隧道和桥梁、消防设施及机电设备安装等工程施工于一体的综合性建筑施工企业。继连年入选江苏省建
In the face of numerous difficulties indomitable, never retreat in the face of difficulties, “Jiangsu CITIC ” done. Algerian Grand Mosque - Construction area of 430,000 square meters, 268 meters above ground, the fourth basement (the world’s third largest mosque, the largest mosque in Afghanistan) was founded in 1977, Jiangsu CITIC Construction Group Co., Ltd. (hereinafter referred to as Jiangsu CITIC) After 36 years of trials and hardships, it has gradually become one of the most important projects in the fields of housing construction, municipal utilities, decoration and decoration of steel structures, foundations and foundations, tunnels and bridges, fire fighting facilities and mechanical and electrical equipment installation. A comprehensive construction company. Following successive years in Jiangsu Province built