为满足珊溪水利枢纽工程施工需要 ,1996年在坝区布设了Ⅱ等施工控制网。为检测控制网的稳定性 ,分别于 1997、1998年对该网进行了复测 ,复测资料均满足规定要求。根据 3a观测资料 ,对控制网稳定性进行分析 ,认为该网存在不稳定因素 ,问题主要有两点 :①该网建立后 1a时间内有变动 ,未进行一定时间的稳定期就进行首次值观测 ;②该网中第 2点建立在山坡上 ,加上随后施工中的大面积开挖 ,具有不稳定因素。因此建立施工控制网应注意 :①控制网点建立完毕后 ,应经过一定时期稳定后再进行首次值观测 ;②控制网点应选在稳定可靠具有良好基础条件的山体上 ,个别控制点被破坏后应能及时恢复。
In order to meet the construction needs of Shanxi Creek Project, a construction network such as Ⅱ was laid in the dam area in 1996. In order to test the stability of the control network, the network was retested in 1997 and 1998 respectively, and the retest data all met the stipulated requirements. According to the observation data of 3a, the control network stability analysis, that the network instability, there are two main problems: ① the network after the establishment of a change within a period of time, without a certain period of time for the first time the value of observations ; ② The second point in the network is built on the hillside, with subsequent large-area excavation in construction, with unstable factors. Therefore, the construction of the control network should be noted: ① control network is established, it should be after a certain period of stability before the first observation; ② control network should be selected in a stable and reliable with good basic conditions of the mountain, the individual control points should be destroyed after Can be promptly restored.