Mutation analysis and prenatal diagnosis of EXT1 gene mutations in Chinese patients with multiple os

来源 :中华医学杂志(英文版) | 被引量 : 0次 | 上传用户:missingmm
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Background Multiple osteochondromas (MO), an inherited autosomal dominant disorder, is characterized by the presence of multiple exostoses on the long bones. MO is caused by mutations in the EXT1 or EXT2 genes which encode glycosyltransferases implicated in heparin sulfate biosynthesis.Methods In this study, efforts were made to identify the underlying disease-causing mutations in patients from two MO families in China.Results Two novel EXT1 gene mutations were identified and no mutation was found in EXT2 gene. The mutation c.497T>A in exon 1 of the EXT1 gene was cosegregated with the disease phenotype in family 1 and formed a stop codon at amino acid site 166. The fetus of the proband was diagnosed negative. In family 2, the mutation c. 1430-1431delCC in exon 6 of the EXT1 gene would cause frameshift and introduce a premature stop codon after the reading frame being open for 42 amino acids. The fetus of this family inherited this mutation from the father.Conclusions Mutation analysis of two MO families in this study demonstrates its further application in MO genetic counseling and prenatal diagnosis.
其他文献
目的研究糖尿病大鼠不同病程心肌纤维化及其相关病理的变化。方法①制造糖尿病大鼠心肌模型随机分组;②氯胺T法测定羟脯氨酸含量,代表心肌胶原总含量。心肌免疫组织化学染色
投资总额:30340万元rn建设周期:2002~2005年rn进展阶段:正在报批项目建议书(立项)rn建设内容:设计灌区4.93万hm+2,设1条总干渠,3条干渠,1条分干渠,支渠210条及其它附属构筑物。
投资总额:8539.3万元rn建设周期:2000~2005年rn进展阶段:正在报批项目建议书(立项)rn建设内容:清淤土方,水工建筑物共需疏浚开挖土方929.83m3,建挡潮闸及排涝强排站各1座,改建、扩建
投资总额:8951万元rn建设周期:2000~2005年rn进展阶段:正在报批可研rn建设内容:设计坝高69.3m,库容516万m3,渠道总长41.7km,隧洞1座长227.5m,设计引水流量3.2m3/s。
13.3 钢和铸铁的可焊性rn金属焊接时,其焊接材料的选择和工艺措施的拟定都与金属的可焊性密切相关.
目的研究脑梗死患者颈动脉硬化情况及其临床意义。方法对100例脑梗死患者(脑梗死组)与100例正常体检者(对照组)进行颈部血管彩色多普勒检查。结果脑梗死组颈动脉硬化发生率较
Background Off-pump coronary artery bypass surgery (OPCAB) has been widely applied in recent years as a less invasive method of myocardial revascularization. Th
玉犬辞旧传捷报,宝猪迎新展未来!rn成就辉煌的2006年已渐渐远去,任重道远的新年已向我们走来.rn新年伊始,我们首先向广大的读者、作者致以最真挚的新春祝福.祝大家新年快乐!
投资总额:96355万元rn建设周期:2000~2004年rn进展阶段:已批可研正在做工程设计rn关键设备:水利工程施工设备、农用机械。rn建设内容:项目建设有6大项,分别是水利工程,种植业,草场封育