如果矿山竖井施工设计中考虑了井口场地的工程地质问题,那么便可避免由于未预计到的地下条件而不能按期竣工和增加费用的重大危险。无论是按经验或是根据对地质条件的工程优化评价作竖井设计,都必须作一定程度的井口场地勘察。本文阐述竖井设计的工程地质问题,并详述了工程地质勘察工作。引言在矿山和土木工程中,竖井设计通常是根据已确定的竖井位置编写提升机、提升容器(箕斗或罐笼)、罐道、井架和有关地面设施的设计说明书和图纸,不注重研究工程
Considering the engineering geological issues at wellhead sites in the design of mine shafts, significant risks of failure to complete and increase costs due to unexpected underground conditions can be avoided. Whether it is based on experience or based on engineering evaluation of the geological conditions for shaft design, a certain degree of well site investigation must be carried out. This article describes the engineering geological problems of shaft design and details the engineering geological survey work. INTRODUCTION In mines and civil engineering, shaft designs are usually based on the position of a shaft that has been established to prepare hoisting machines, design instructions and drawings for containers (skip or cage), canopies, derricks and related ground facilities, without paying attention to research engineering