沙尔特大桥工程属于兰新铁路第二双线(新疆段)LXTJ4标段,位于哈密盆地北侧、戈壁滩沙尔—红旗坎的百里风区。大桥全长1 253.77 m,桥梁下部为摩擦桩基础,拥有钻孔桩近400根、10 000延米的工程量。施工方
The project of Schalt Bridge belongs to the LXTJ4 section of the second double line of Xinjiang-Xinjiang Railway (Xinjiang section) and is located in the Baili wind area on the north side of the Hami Basin and the Sha’er-Hongqikan of Gobi Desert. The total length of the bridge is 1 253.77 m. The lower part of the bridge is a friction pile foundation. It has a construction capacity of nearly 400 bored piles and 10,000-meter delay. Construction side