在希腊,为了防止旧水电厂发生故障,需对其进行更新改造,优先考虑指数问题得到验证。这些指数对每台水电机组进行更新改造的研究具有决定性作用。 开发水电厂的一个主要目标就是能源再生利用。因此对于那些步入使用寿命下限的机组,通过适当提高功率或部分更新改造来延长其使用年限。 水电厂的更新改造需要很高的投资和较长的资金回收期。因此对水电厂的更新改造
In Greece, in order to prevent the failure of old hydropower plants, it is necessary to renovate them and give priority to the verification of the index issue. These indexes have a decisive effect on the research and reconstruction of each hydropower unit. One of the main goals of the development of hydropower plants is the recycling of energy. Therefore, for those units that have reached the lower end of their useful life, their useful lives are extended by appropriate improvements in power or partial retrofitting. The upgrading of hydropower plants requires high investment and long payback period. Therefore, the renovation of hydropower plants