论文部分内容阅读
本文主要介绍京广线K640+942老田庵闸门旧桥拆除工程施工方案的选择,并对具体施工方案的施工方法步骤、要点、施工注意事项进行了论述。
This article mainly introduces the selection of the construction scheme of old bridge demolition of the old Kuantian Line K640 + 942 Jing-Guang Line, and discusses the construction steps, key points and construction precautions of the concrete construction scheme.