论文部分内容阅读
2015年12月31日,巴基斯坦旁遮普省巴哈瓦尔布尔市的300兆瓦光伏工业园区,中国一冶集团有限公司(简称“中国一冶”)873名中国建设者与2800名巴基斯坦技工欢聚园区生活营区,在篝火前载歌载舞,庆祝项目基本完工,达到基本并网条件,用欢声笑语和美好祝福迎接2016年的到来。巴基斯坦300兆瓦光伏发电项目自2015年6
On December 31, 2015, a total of 873 Chinese builders of China First Metallurgical Group Co., Ltd. (“China First Metallurgical”), 300 MW photovoltaic industrial complex in Bahawalpur, Punjab, Pakistan, gathered with 2800 Pakistani technicians Park life camp, song and dance before the fire, to celebrate the basic completion of the project to reach the basic conditions and grid, with laughter and good wishes to greet the arrival of 2016. Pakistan 300 MW Photovoltaic Power Generation Project since 2015 6