一、水电站主机室及控制室設备对照明的要求: 在水电站中,主机室是唯一最高最大的房間,主要有發电机、励磁机、机旁盤和調速裝置等设备及檢修平台。由於主机室的被照面积較大,房屋結構也較一般民用建筑复杂,室內的机电設备又彼此牽連,再加以各部分設备对於光源要求的方向也不一致,因此在白天有时也不能完全依靠天然採光,而需要适当地考虑局部照明。水电站必須昼夜进行工作。为了保証工作人員视
First, the hydropower station control room and host equipment lighting requirements: In the hydropower station, the host room is the only room with the highest maximum, mainly generators, exciter, the machine next to the device and speed control devices and platforms. Due to the large size of the host room being illuminated, the structure of the house is also more complicated than that of ordinary civil buildings, and the mechanical and electrical equipment in the room are implicated in each other. In addition, the requirements of each part of the equipment are not consistent with the requirements of the light source, Rely on natural lighting, and need to properly consider local lighting. The hydropower station must work day and night. In order to ensure that staff view