关于坝后式厂房厂坝连接型式的探讨

来源 :水力发电 | 被引量 : 0次 | 上传用户:yuxinliuyun
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、厂坝连接型式的概况根据国内外工程实践经验,对于坝后式厂房,为使厂坝各自受力明确,习惯上常常采用厂坝分缝的结构型式,即假定大坝和厂房是两个互相独立的结构,荷载不相互传递。而实际上大坝和厂房基础是连在一起的,基础变位是 First, the overview of the type of factory dam connection According to the practical experience at home and abroad, for the dam-style plant, in order to force each plant dam clear, often used to plant dam structure of the joints, that is, assuming the dam and plant are two An independent structure, the load does not pass each other. In fact, the foundation of the dam and the plant are linked together, and the basic displacement is
其他文献