论文部分内容阅读
所谓“三电迁改”是指铁路建设路外的通信线路、广播电视线路、电力线路的迁改,具有很强的专业性,其中包含国家两个电网的电力设施、工信部的通信设施、广电部门的通信信号设施。三电迁改是属于铁路征地拆迁范畴又不属于征迁的特殊项目。我国铁路建设事业的不断发展,以及多条高速铁路线路建设,受到了社会各界的广泛关注,尤其在我国当前社会经济的发展进程中,其经济增长的一个重要的动力就在于实现对固定投资的增加。我国的铁路建设也出现了又一个发展高峰,三电
The so-called “three electromechanical change ” refers to the railway construction road outside the communication lines, radio and television lines, power lines relocation, with strong professionalism, including the two national power grid facilities, Ministry of Industry and communication facilities , Radio and television departments of the communication signal facilities. Three electromechanical changes belong to the scope of the land requisition and demolition of railway does not belong to the special project of requisition. The continuous development of China’s railway construction and the construction of a number of high-speed railway lines have drawn wide attention from all walks of life. Especially in the process of social and economic development in our country, an important driving force of its economic growth lies in the realization of the long- increase. China’s railway construction also appeared another peak of development, three electricity