项目建设中时间与投资的关系一般是时间越短投资越低,但短到一定程度后再压缩工期会使投资大幅度增加,这就是说有一个最短工期的限制无限压缩工期不能达到降低投资的目标。时间和质量的关系一般是时间越长质量越好,但长到一定程度后再延
The relationship between time and investment in the construction of the project is generally the lower the investment time, the lower the investment but the shortened to a certain extent and then compress the construction period will greatly increase the investment, which means that there is a limit of the shortest construction period Unlimited compression period can not be achieved to reduce the investment aims. The relationship between time and quality is generally the longer the better the quality, but after reaching a certain level and then extended