【摘要】近年来,我国加快了对于水利资源的开发与利用,水利工程的建设数量逐年增多。在水利工程建设中,机电设备管理是其重要组成部分,涉及机电设备的安装、使用、检测、维修等,其根本目的是保障水利工程的整体建设质量与运行效率,创造最大的经济效益与社会效益。水利工程机电设备安装中,应注意对于细节问题的深入研究与实践,保证安装工程中成本、质量、进度与安全的有机协调。在水利工程投入使用后,应将机电设备维修作为管理工作的重要项目之一,保证各种设备的正常运行和良好的状态,从而提高设备的利用率与完好率,增加机电设备的使用寿命,使其综合效益不断提升。
【关键词】机电设备;安装,维修
【Abstract】In recent years, the our country sped for the water conservancy resources of development and make use of, marine hydraulic engineering of construction the amount year by year increase.In the marine hydraulic engineering construction, machine electricity equipments management is it importance constitute part, involve machine electricity equipments of install, usage, examination, maintain etc., it root purpose is guarantee marine hydraulic engineering of whole construction quality and circulate efficiency, create biggest of economy performance and society performance.Marine hydraulic engineering machine electricity the equipments install medium, should attention for detail problem of thorough research and practice, assurance install the cost, quality, progress in the engineering and safety of organic moderate.After the marine hydraulic engineering throw in use, should machine electricity the equipments maintain Be management work of importance one of the items, assurance various equipments of normal circulate with good appearance, thus exaltation equipments of utilization and intact rate, increment machine electricity equipments of service life, make it comprehensive the performance continuously promote.
【Key words】Machine electricity equipments;Install, maintain
1. 水利工程机电设备的安装管理
在国内现阶段的水利工程项目建设中,大型机电设备安装是现场施工管理的重点与难点之一,由于其具有体积大、技术等级高、配套设备多、安装与调试复杂等特点,客观上加大了安装管理工作的难度。在水利工程机电设备的安装管理中,必须加强安装人员的组织与技术培训,并且对于安装与调试阶段进行全方位的管控,从而达到预期的工程建设目标。
1.1人员的组织与技术培训
在水利工程机电设备安装前期,设备供应商应委派专业技术人员协助施工企业进行机电设备的安装与调试。施工企业要加强对于人员的组织与技术培训,使他们了解机电设备的基本结构、功能以及安装与调试注意事项等。在机电设备安装过程中,应由项目经理部组织经验丰富的技术人员进行现场管理,加强对安装人员的技术指导与安装质量监管,从而做好机电设备安装前的各项准备工作。
1.2安装与调试阶段
水利工程机电设备的一般安装流程为:基座施工——安装前期准备工作——设备安装。(1)基座施工。在水利工程基座施工放线前期,应结合施工现场的实际情况,明确各种机电设备的安装位置、布局需要,对于堆料场、上料台、配套机械、运输车辆通道等也要进行相应的修整。基座施工中必须做到严格执行各种工艺与技术规范,这也是确保机电设备安全、高效运行的先决条件。
(2)安装前期准备工作。在机电设备安装前,现场技术人员应对其外观质量进行全面的检查,并认真检查各附属设备的质量是否可靠,配件是否缺少等。
(3)设备安装。在水利工程机电设备安装过程中,现场技术管理人员要随时对主设备、部件、附属设备的外观质量进行检查。安装现场必须由专业的技术人员负责。在进行高空作业安装、吊装笨重装置的过程中,必须采取相应的安全防范与管理措施。在现场安装过程中,
安装人員必须佩带安全帽,非施工作业人员应尽量远离现场,以免出现安全事故。水利工程机电设备安装中,应注意分工协作。在机电设备安装完成后,对于设备安装的安全性与完整性要进行全面、系统的检查,在确保安装质量后开机调试设备,主要检验项目为机电设备的操作性能、工作质量与经济性能等。在机电设备调试中,各部门人员应及时到位,由专人负责调试全过程的记录,其中包括机电设备的原始数据、安装时间、调试时间、运行状态报告等。 2. 水利工程机电设备运行中常见故障与维修方法
在水利工程项目投入使用以后,机电设备的运行质量直接关系到工程项目的整体经济效益与社会效益。在水利工程机电设备运行过程中,必须将故障分析与维修置于重要的位置,从而保障机电设备的安全、稳定、高效运行。笔者结合多年水利工程机电设备管理经验,总结了以下常见运行故障与维修方法:
2.1水轮发电机组故障与维修方法
(1)定子引出线电缆外表皮破裂。在国内水利工程机电设备运行中,定子引出线电缆表皮纵向或横向破裂的现象较为常见,可采取临时包扎的处理办法,在电缆支架上加装1块橡皮作为垫片,以避免电缆表皮的进一步损坏,而形成2点胶合故障。为了保障水轮发电机组的正常运转,应根据实际情况逐一进行更换,并且采取有效的电缆表皮坚固措施。另外,定子引出线电缆外表皮破裂可能导致机电设备漏电,维修人员要做好必要的安全防护,维修必须在断电状态下进行。
(2)定子转动引起温升过高。在机电设备运行过程中,如果超出电机的额定载荷,有可能造成定子转动过快而引起升温过高的现象,对于水轮发电机组运行的安全性造成较大的威胁。定子转动引起升温过高的处理方法主要包括:1)根据水工建筑的结构、功能区域、用户的实际需要及水平线缆长度等,合理确定管理子系统的数量,必须满足水平线缆<90m的技术要求,尽量减少管理区的数量,这样不但减少系统运行中的能耗,而且方便对于机电设备的运行管理;2)配线问的位置可以选在距离弱电竖井、竖井旁较近的房间内,以利于对水轮发电机组运行状态的实时监控,当出现定子转动引起温升过高现象时,自动化控制系统将发出警报或自动进行调节,从而保证定子转动维持在一种相对平衡的状态,避免因局部升温过高而造成机电设备的损坏。
(3)组合轴承漏油。在水轮发电机组运行过程中,如果发现其内部油雾严重,必须及时进行全面的检查与维修。组合轴承漏油的引发因素多与水轮发电机组的组合形式有关,特别是在大型水利工程中,水力发电机组的结构较为复杂,如果轴承端盖的密封处理不当,有可能造成电机渗油,而发电机大轴、连接螺栓之间的密封圈则难以发挥应有的作用,以致油会顺着螺纹流出。在水轮发电机组出现组合轴承漏油现象时,可以采取以下维修方法:在组合轴承大轴法兰、镜板的连接螺栓之间加装1个铜垫止漏,铜垫代替轴承端盖的作用,确保组合轴承内部的油不能从螺纹中流出。经过了一系列的实践证明,该处理方法的操作较为简单,而且对于组合轴承漏油问题具有较为理想的處理效果。
2.2异步电动机故障及维修方法
在水利工程机电设备运行中,异步电动机常见的故障一般可以分为机械故障、电气故障等,其中机械故障以轴承、机座、风叶、铁心、转轴等故障为主,较易观察和发现,维修方法也较为简单;电气故障以定子绕组、电刷等导电部分故障为主。由于异步电动机的结构型式、运行环境、制造质量、使用与维护情况不同,同一故障可能表现为不同的外观现象。因此,在水利工程机电设备的运行过程中,必须对异步电动机故障做出正确的判断,设备管理人员要认真、细致地观察、研究与分析各种故障的引发因素和维修方法,通过科学的检查与测量,实现维修方法的合理性、有效性。在异步电动机的故障诊断中,设备管理人员必须了解其型号、规格、使用条件、使用年限等基本信息,对于异步电动机在发生故障前的实际运行情况也要进行深入的了解,在现场故障诊断过程中,设备管理人员要认真观察异步电动机的负荷大小、温升高低、声音是否正常、操作情况等,根据操作人员所反映的情况,对异步电动机的运行故障进行合理的诊断。在异步电动机的维修中,必须由专业的技术人员进行相关操作,通过仪表测量或观察等确定故障的具体位置,将机器拆开后应及时进行维修,
对于损坏或老化的零件要及时进行更换,出现漏电现象的电动机则要对线路板、导线、连接线路等进行逐一检查。
3. 结语
综上所述,在水利工程项目建设中,必须高度重视机电设备的安装与维修管理,特别是在重要水利枢纽、水电站的建设与使用中,机电设备的安装必须严格执行相关操作规程和技术规范,在设备安装完成后要进行全面的质量检测,确保无质量、安全问题后,方可投入使用。在水利工程机电设备运行过程中,要加强对其运行状态的实时监控,一旦发现各种运行故障,必须采取行之有效的维修方法,以保障机电设备运行的安全性、经济性、稳定性,促进水利工程项目整体经济效益和社会效益的提升。
【关键词】机电设备;安装,维修
【Abstract】In recent years, the our country sped for the water conservancy resources of development and make use of, marine hydraulic engineering of construction the amount year by year increase.In the marine hydraulic engineering construction, machine electricity equipments management is it importance constitute part, involve machine electricity equipments of install, usage, examination, maintain etc., it root purpose is guarantee marine hydraulic engineering of whole construction quality and circulate efficiency, create biggest of economy performance and society performance.Marine hydraulic engineering machine electricity the equipments install medium, should attention for detail problem of thorough research and practice, assurance install the cost, quality, progress in the engineering and safety of organic moderate.After the marine hydraulic engineering throw in use, should machine electricity the equipments maintain Be management work of importance one of the items, assurance various equipments of normal circulate with good appearance, thus exaltation equipments of utilization and intact rate, increment machine electricity equipments of service life, make it comprehensive the performance continuously promote.
【Key words】Machine electricity equipments;Install, maintain
1. 水利工程机电设备的安装管理
在国内现阶段的水利工程项目建设中,大型机电设备安装是现场施工管理的重点与难点之一,由于其具有体积大、技术等级高、配套设备多、安装与调试复杂等特点,客观上加大了安装管理工作的难度。在水利工程机电设备的安装管理中,必须加强安装人员的组织与技术培训,并且对于安装与调试阶段进行全方位的管控,从而达到预期的工程建设目标。
1.1人员的组织与技术培训
在水利工程机电设备安装前期,设备供应商应委派专业技术人员协助施工企业进行机电设备的安装与调试。施工企业要加强对于人员的组织与技术培训,使他们了解机电设备的基本结构、功能以及安装与调试注意事项等。在机电设备安装过程中,应由项目经理部组织经验丰富的技术人员进行现场管理,加强对安装人员的技术指导与安装质量监管,从而做好机电设备安装前的各项准备工作。
1.2安装与调试阶段
水利工程机电设备的一般安装流程为:基座施工——安装前期准备工作——设备安装。(1)基座施工。在水利工程基座施工放线前期,应结合施工现场的实际情况,明确各种机电设备的安装位置、布局需要,对于堆料场、上料台、配套机械、运输车辆通道等也要进行相应的修整。基座施工中必须做到严格执行各种工艺与技术规范,这也是确保机电设备安全、高效运行的先决条件。
(2)安装前期准备工作。在机电设备安装前,现场技术人员应对其外观质量进行全面的检查,并认真检查各附属设备的质量是否可靠,配件是否缺少等。
(3)设备安装。在水利工程机电设备安装过程中,现场技术管理人员要随时对主设备、部件、附属设备的外观质量进行检查。安装现场必须由专业的技术人员负责。在进行高空作业安装、吊装笨重装置的过程中,必须采取相应的安全防范与管理措施。在现场安装过程中,
安装人員必须佩带安全帽,非施工作业人员应尽量远离现场,以免出现安全事故。水利工程机电设备安装中,应注意分工协作。在机电设备安装完成后,对于设备安装的安全性与完整性要进行全面、系统的检查,在确保安装质量后开机调试设备,主要检验项目为机电设备的操作性能、工作质量与经济性能等。在机电设备调试中,各部门人员应及时到位,由专人负责调试全过程的记录,其中包括机电设备的原始数据、安装时间、调试时间、运行状态报告等。 2. 水利工程机电设备运行中常见故障与维修方法
在水利工程项目投入使用以后,机电设备的运行质量直接关系到工程项目的整体经济效益与社会效益。在水利工程机电设备运行过程中,必须将故障分析与维修置于重要的位置,从而保障机电设备的安全、稳定、高效运行。笔者结合多年水利工程机电设备管理经验,总结了以下常见运行故障与维修方法:
2.1水轮发电机组故障与维修方法
(1)定子引出线电缆外表皮破裂。在国内水利工程机电设备运行中,定子引出线电缆表皮纵向或横向破裂的现象较为常见,可采取临时包扎的处理办法,在电缆支架上加装1块橡皮作为垫片,以避免电缆表皮的进一步损坏,而形成2点胶合故障。为了保障水轮发电机组的正常运转,应根据实际情况逐一进行更换,并且采取有效的电缆表皮坚固措施。另外,定子引出线电缆外表皮破裂可能导致机电设备漏电,维修人员要做好必要的安全防护,维修必须在断电状态下进行。
(2)定子转动引起温升过高。在机电设备运行过程中,如果超出电机的额定载荷,有可能造成定子转动过快而引起升温过高的现象,对于水轮发电机组运行的安全性造成较大的威胁。定子转动引起升温过高的处理方法主要包括:1)根据水工建筑的结构、功能区域、用户的实际需要及水平线缆长度等,合理确定管理子系统的数量,必须满足水平线缆<90m的技术要求,尽量减少管理区的数量,这样不但减少系统运行中的能耗,而且方便对于机电设备的运行管理;2)配线问的位置可以选在距离弱电竖井、竖井旁较近的房间内,以利于对水轮发电机组运行状态的实时监控,当出现定子转动引起温升过高现象时,自动化控制系统将发出警报或自动进行调节,从而保证定子转动维持在一种相对平衡的状态,避免因局部升温过高而造成机电设备的损坏。
(3)组合轴承漏油。在水轮发电机组运行过程中,如果发现其内部油雾严重,必须及时进行全面的检查与维修。组合轴承漏油的引发因素多与水轮发电机组的组合形式有关,特别是在大型水利工程中,水力发电机组的结构较为复杂,如果轴承端盖的密封处理不当,有可能造成电机渗油,而发电机大轴、连接螺栓之间的密封圈则难以发挥应有的作用,以致油会顺着螺纹流出。在水轮发电机组出现组合轴承漏油现象时,可以采取以下维修方法:在组合轴承大轴法兰、镜板的连接螺栓之间加装1个铜垫止漏,铜垫代替轴承端盖的作用,确保组合轴承内部的油不能从螺纹中流出。经过了一系列的实践证明,该处理方法的操作较为简单,而且对于组合轴承漏油问题具有较为理想的處理效果。
2.2异步电动机故障及维修方法
在水利工程机电设备运行中,异步电动机常见的故障一般可以分为机械故障、电气故障等,其中机械故障以轴承、机座、风叶、铁心、转轴等故障为主,较易观察和发现,维修方法也较为简单;电气故障以定子绕组、电刷等导电部分故障为主。由于异步电动机的结构型式、运行环境、制造质量、使用与维护情况不同,同一故障可能表现为不同的外观现象。因此,在水利工程机电设备的运行过程中,必须对异步电动机故障做出正确的判断,设备管理人员要认真、细致地观察、研究与分析各种故障的引发因素和维修方法,通过科学的检查与测量,实现维修方法的合理性、有效性。在异步电动机的故障诊断中,设备管理人员必须了解其型号、规格、使用条件、使用年限等基本信息,对于异步电动机在发生故障前的实际运行情况也要进行深入的了解,在现场故障诊断过程中,设备管理人员要认真观察异步电动机的负荷大小、温升高低、声音是否正常、操作情况等,根据操作人员所反映的情况,对异步电动机的运行故障进行合理的诊断。在异步电动机的维修中,必须由专业的技术人员进行相关操作,通过仪表测量或观察等确定故障的具体位置,将机器拆开后应及时进行维修,
对于损坏或老化的零件要及时进行更换,出现漏电现象的电动机则要对线路板、导线、连接线路等进行逐一检查。
3. 结语
综上所述,在水利工程项目建设中,必须高度重视机电设备的安装与维修管理,特别是在重要水利枢纽、水电站的建设与使用中,机电设备的安装必须严格执行相关操作规程和技术规范,在设备安装完成后要进行全面的质量检测,确保无质量、安全问题后,方可投入使用。在水利工程机电设备运行过程中,要加强对其运行状态的实时监控,一旦发现各种运行故障,必须采取行之有效的维修方法,以保障机电设备运行的安全性、经济性、稳定性,促进水利工程项目整体经济效益和社会效益的提升。