DESIGN OF COMPOSITE SEGMENT FOR UNDERGROUND DISCHARGE CHANNEL

来源 :第五届中日盾构隧道技术交流会 | 被引量 : 0次 | 上传用户:rilinx_2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Composite segment has been widely used in deep shield tunnel.However,the present design for composite segment based on the theory of reinforced concrete cannot appropriately reflect the excellent properties of composite segment.Therefore,the rational design method of composite segment is required.In this paper,the proposed mechanical model is used to design the most complicated composite segment called as closed composite segment for underground discharge channel based on the limit state design method.As a result,the reduction of segment thickness is obtained using Closed-composite segment and this indicates that composite segment is suitable for decreasing muck,construction period and the outside diameter of the shield machine.In general,the costs of construction,risk,and maintenance will be decreased
其他文献
  阐述了应用地质雷达对大直径盾构隧道壁后注浆无损检测的技术,介绍了探地雷达的基本原理和方法以及该新技术在工程应用中的技术方法,并分析了异常情况在雷达图像上的反映,得
  盾构以其机械化程度高、推进速度快、对环境适应性强、工程拆迁量小等优点广泛的应用在城市交通隧洞工程中。北京市南水北调配套工程团城湖至第九水厂输水工程隧洞采用盾
  采用正交试验方法,对某地铁岩溶注浆浆液进行了配比试验研究。浆液由红黏土、水泥和水玻璃制成。在对浆液结石体无侧限抗压强度进行极差分析的基础上,得出红黏土固化浆液的
  在建的杭州市庆春路过江隧道是下穿钱塘江的第一条交通隧道工程,隧址工程地质条件及河段水文条件复杂,隧道过江段采用盾构法施工,南北岸边段采用明挖法施工。本文介绍了庆春
  随着城市地铁的快速发展,采用盾构法修建城市地铁隧道的情形越来越多,在软硬不均或软硬交互且岩石强度差异很大的复合地层采用盾构法修建地铁隧道就越来越复杂,本文通过深圳
  本文针对上海世博电力隧道盾构下穿越运营地铁1号线工程,分析了下穿越施工过程中的盾构施工控制要素并提出了主要施工参数的范围。然后对实际下穿越的施工参数及1号线变形
  以成都地铁2号线西延线工程盾构下穿铁路桥为背景,通过数值计算的方法,研究盾构下穿铁路桥时对既有桥墩的影响以及盾构隧道管片结构的力学特征。通过研究表明,盾构近距离通
  文章系统总结了狮子洋盾构隧道在中硬岩地层中施工时遇到的碎石机故障和刀具磨损更换的两大技术难题,并通过在施工实践中不断的总结完善优化,提出了针对性的技术对策,供借鉴
  本文以西安地铁某区间盾构法隧道为例,运用二维数值模拟方法模拟了平行盾构隧道开挖过程,分析了平行隧道净距、地层条件以及应力释放系数等参数对地表沉降、塑性区以及管片
  本文根据南京长江盾构隧道横断面及纵断面设计情况,采用火灾数值分析软件FDS,对盾构隧道纵向排烟情况下不同位置处发生火灾进行了数值模拟,比较了火灾情况下不通风和控制