Probabilistic load modelling for long span bridges

来源 :The 7th International Conference on Bridge Maintenance, Safe | 被引量 : 0次 | 上传用户:sumriver
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Long span bridges are regularly subjected to the simultaneous presence of multiple vehicles,resulting in high traffic volumes,the behaviour of which is governed by drivers/vehicle interaction such as velocity and driverslane changing and overtaking.On a long span bridge,when the traffic is congested,driver behaviour leads to a lane distribution of car-truck mixes that may result in clustering of heavy trucks in critical positions.
其他文献
A new cable-stayed bridge is currently under construction across the River Yamuna in Wazirabad,Delhi.The bridge will have a total length of 675 m,with a main span of 251 m.Its steel-concrete composite
会议
Bridge deck cracking can cause deterioration of bridge decks,leading to a rapid aging and poor performance.This problem is usually caused by drying shrinkage within the concrete.The material propertie
会议
Cable-stayed bridges are modem solutions offering important advantages: the possibility to cover large spans and through this reducing the number of substructure elements,a relative small construction
会议
After experiencing huge natural disasters such as earthquakes and typhoons people are becoming more concemed with the safety of bridges.As a matter of fact,it was more than 18 years ago on 17th of Jan
会议
A detailed riparian field study to assess the importance of bedrock groundwater in streamflow processes was established in the headwaters of the Afon Hafren,midWales,UK.Results from this study identif
会议
Through the history,bridges are designed for varying traffic loads,and designs are made using varying assessments methods.In long-term,weight of permitted vehicles tends to increase over time.To serve
会议
The diagonal crack in the webs of box-girder has been one of the most common diseases in long-span prestressed concrete box-girder bridges in recent years.One of the key reasons is the great prestress
会议
The structural design aims at minimizing the total cost without compromising the functional requirements.The design has to ensure structural integrity by considering the entire life cycle,from design
会议
The use of dynamic programming algorithms for the optimization Markov Decision Processes (MDPS)related to the Inspection,maintenance and rehabilitation (IM&R) decisions of civil engineering facilities
会议
The Precast Segmental Bridge Piers (PSBP) is composed of precast elements joined together by means of wet joints.There have been a number of joints proposed for application of PSBP in regions with mod
会议