论文部分内容阅读
本文想强调这样一个事实:既然工程评价是对未来的估计,那就必然不会准确。在进行工程评价时应考虑这个问题。
This article would like to emphasize the fact that since project evaluation is an estimate of the future, it is inevitable that it will not be accurate. This issue should be considered when conducting engineering evaluations.