论文部分内容阅读
加强职工队伍建设管好现代化电厂胡尧安(鲁布革发电总厂)党委书记鲁布革电站是我国水电建设第一个部分引进外资,对外开放的工程。它采用了多项新技术、新工艺和新设备.主要的机电设备从国外引进,实现了主要设备由计算机监控运行,基本上反映了八十年代国际水电建设的...
Strengthen the Construction of the Staff Team and Manage the Modern Power Plant Hu Bian’an (Lubuge General Power Generation Plant) Party Secretary Lu Buge Power Station is the first part of China’s hydropower construction to introduce foreign capital and open to the outside world. It uses a number of new technologies, new processes and new equipment. The main electromechanical equipment was imported from abroad and the main equipment was monitored and operated by a computer, basically reflecting the international hydropower construction of the 1980s...