三峡电站在全国跨大区联网的电力系统中处于核心地位,重要性十分突出,右岸电站是三峡电站的重要组成部分,要求控制系统不仅有非常高的可靠性,并应考虑特大型水电工程实施时间跨度大,不同的设备制造厂家及进度,现场机组投产施工期的灵活性,考虑电站建设期向运行期平稳过渡。本文针对上述问题,重点讨论系统设计原则、系统总体结构模式以及提高可靠性的措施等,以满足三峡右岸电站控制和未来发展的需要。
The Three Gorges hydropower station is at the core of the power system interconnected across regions across the country. The right bank power station is an important part of the Three Gorges hydropower station. The requirements of the control system are not only very high reliability, but also the implementation of super large hydropower projects Time span, different equipment manufacturers and progress, on-site crew put into operation the flexibility of construction period, consider the smooth construction of the transition period to the operation period. In response to the above problems, this paper focuses on the principles of system design, the overall structure of the system and the measures to improve the reliability so as to meet the needs of control and future development of the Three Gorges right bank power plant.