摘要:所谓的施工缝就是房建工程项目的施工组织在施工单元各分区间留设的缝。施工缝并不是一种真实存在的“缝”,它只是由于后浇注混凝土超过初凝时间,而与先浇注的混凝土之间形成的一个结合面,这个结合面就是施工缝。本文结合具体的工程实例,从房建工程项目中施工缝的留设位置谈起,然后就房建工程项目中应用的施工缝留设技术进行分析,最后就房建工程项目中施工缝的留设施工质量控制举措进行说明。
关键词:施工缝 留设技术 房建工程项目 应用
Abstract: the so-called construction seam is endowed the organization of construction project construction unit in the area for the seam between set. Construction joints and is not a real "sew", it is only after pouring concrete because more than initial set time, and with the first formed between concrete pouring a combination of surface, the surface is combined with construction joints. Combining with the specific engineering examples, from the project construction joints in endowed the set of a position, and then fittest of the application of project construction joints stay put technologies were analyzed, finally the fittest project construction joints in the construction quality control measures for a show.
Keywords: construction joints stay put technology project application endowed
中图分类号:TU74文献标识码:A 文章编号:
前言
在房建工程浇筑整体砼的施工中,由于施工过程中容易受诸多因素的影响,浇筑不能连续完成,需留设施工缝,施工缝的位置应在砼浇筑之前确定,而且应该留设在结构受剪力较小且方便施工的部位。在此基础上,施工人员应严格按规范要求进行,认真了解施工缝的留置及处理,这是确保房建工程施工质量的重要环节。
一、房建工程项目中施工缝的留设位置
房建工程项目中施工缝的留设位置多在受力较小处,受动荷载影响不大的地方,同时施工缝的留设位置应该尽量避开有防水要求的地方,结合大量的工程实践,笔者总结认为房建工程项目中施工缝的留设位置主要有以下几种:
1、柱处的施工缝一般都要留在基础的上部水平面上,梁或吊车梁牛腿的下面。无梁楼板柱帽的下面。施工缝的表面应垂直于构件的轴线。
2、梁板、肋形楼板处的施工缝一般都要和板连成整体的大截面梁,留在板底面以下2-3CM处。当板下有梁托时,留在梁托以下。浇筑单向板时,可留在平行于板的短边的任何位置。有主次梁的,当顺着次梁方面浇时,施工缝留置在次梁跨中1/3范围内。当顺着主梁浇时,应留在主梁同时亦为板跨的中间2/4范围内,应注意施工缝应和相应的轴线垂直,梁板可留企口或垂直缝,不宜留斜槎。
3、地下室及地沟处的施工缝一般都留置在地下室梁板与基础连接处,外墙底板以上和上部梁、板下部2-3CM处可留水平施工缝。
4、箱形基础处的施工缝一般都留置在底板、顶板与外墙的水平施工缝应设在底板顶面以上及顶板度面以下30-50CM为宜,接缝宜设钢板等止水措施。底板与内墙的施工缝可设在底板与内墙交接处,而顶板与内墙的施工缝,位置应视剪力墙拖筋的长短而定,一般100CM以内即可。
5、在较大框架中,如为正方形或为井字梁,或是主次梁分别不是很大,而施工时,混凝土又不可能一次浇筑完毕时,必须设置施工缝。
6、在楼梯的施工中,施工缝留在梯段的三分之一处效果最好,现在都是这么施工,将踏步往上多支几步,这一施工做法也可以方便施工,对于结构没有多大的影响.但在浇筑楼梯混凝土时要格外注意保证梯段负弯矩钢筋的正确位置,如果钢筋被踩下去了,无形之中使楼梯梯段(斜板)的截面有效计算高度,对工程非常不利。另外楼梯进行下一步浇筑混凝土前要将施工缝处要妥善处理。
7、在砖混结构中,如果把施工缝留在圈梁的一半处的这种方法尽量避免出现,组织施工时要合理安排,把施工缝留至变形缝处,实现整体现浇,在临时停水、停电的情况下,可将施工缝留在圈梁的一半处,对结构影响不大(因圈梁本身只是抗震构造要求,增加房屋的整体刚度,不是受力构件)。
二、房建工程项目中应用的施工缝留设技术分析
(一) 施工缝钢丝网的安装
施工缝钢丝网的裁剪应根据各层梁截面和板的厚度而定,网的宽度要比板厚度宽一般为50mm,底部向新浇砼方向弯折。遇到梁筋或板筋位置,即用钢丝剪裁开缺口,以便施工缝钢丝网能将钢筋保护层的空隙封住不跑浆,施工缝钢丝网要安装在竖向定位钢筋靠轴的一侧,施工缝钢丝网的搭接控制在100mm的范围内,施工缝钢丝网安放好以后,即用铁丝绑扎在上下定位钢筋上,楼板面的保护层即用锯出的夹板条压在竖向定位钢筋上,并用铁丝绑扎牢固。上述各步工作做好后,随即检查施工缝钢丝网是否存在偏位和松动的现象,保护层是否合理,如有问题及时纠正。另外,施工缝的钢丝网安装好后,要挂出警示牌或安排一各工人监护,避免人为破坏。
(二)施工缝留设前的各项准备工作
1、施工缝留设位置的选择
各层柱和剪力墙的施工缝则留设在框架梁底位置,在浇筑柱和剪力墙混凝土前,先检查墙柱模板是否牢固,尺寸是否合理,板缝是否密实,模板内的杂物是否清理,清理并要垫好钢筋的保护层,是否待处理完检查合格后才能浇筑混凝土和留设施工缝。
2、施工缝留设位置处的防护
混凝土浇筑完成后,随即派专人对钢丝网外侧漏出或撒落的砼碴及时清理干净,变形的钢筋及时调直复位,浇筑混凝土时,应对施工缝至轴位置已绑扎好的钢筋加予保护,方法是在钢筋面铺上夹板,然后覆盖彩条布,避免人为踏坏钢筋以及施工不慎所撒的砼掉落到梁底和楼板上而增加清理难度。因此,做好、施工缝留设位置处的防护工作,意义重大。
(三)施工缝的处理和砼浇筑
在房建工程项目施工中,应在浇筑楼面混凝土前,检查及清理干净施工缝部位的砼碴和杂物,并用清水进行清洗,充分浇湿接口位置的旧砼,然后在即将接合时,将旧砼表面淋上一层水泥浆。施工缝约1米宽位置要用比楼面砼高一级的砼浇筑,或加膨胀剂,充分振捣密实,并要注意该部位的混凝土级配和砼的坍落度,避免砼离析及坍落度过大。
在浇筑柱、剪力墙混凝土和生成施工缝时,要先用清水将模板充份淋湿,然后墙、柱脚底部用同等标号水泥砂浆浇筑一层约5cm厚左右,浇筑墙、柱混凝土必须要分层浇筑,振捣密实,每层厚度控制在1米左右,严格控制混凝土的坍落度在14~16cm之间。浇筑至梁底位置时,观察如果有浮浆要进行清理干净,然后再用同标号混凝土填至梁底标高,并在混凝土表面均匀撒上干净碎石子或在混凝土终凝后进行凿毛。墙、柱混凝土浇筑完成后,随即检查调整墙、柱钢筋,清理干净沾污在钢筋表面和模板表面的砼浆,进而做好施工缝处的各项处理工作。
(四)施工缝和砼的养护
施工缝和砼的养护是保证混凝土的设计强度和防止混凝土龟缩开裂的关键,有条件的要蓄水养护,无法蓄水养护时即指定专人淋水养护,经常保持施工缝和砼表面的湿润。另外,在施工缝位置要用塑料薄膜加予覆盖,同时养护期不得少于7天。
三、房建工程项目中施工缝的留设施工质量控制举措
结合一些具体的工程实践,笔者认为,在房建工程项目中做好施工缝的留设施工质量的控制工作,还需要做好如下几点:
第一、指定专职责任人,由其负责施工缝的留设施工质量控制工作的落实,并进行施工全过程的监督。
第二、竖持严格的检查制度,施工缝的钢丝网安装完成后,在进行楼面钢筋检查的同时对钢丝进行检查,发现问题及时纠正,复检合格并交由监理验收后才交由混凝土施工人員进行浇筑施工。
第三、加强混凝土施工过程的监控,务必振捣密实,混凝土表面待收水后进行刮平和打磨反砂。
第四、在施工缝约1米的部位,必须严格按照规范的房建工程缝留设施工方法的施工要领和步骤进行操作,并全过程加强监督实施,务必达到相关的质量要求。
第五、对有关的施工管理人员和实际操作人员进行施工方案交底以及施工技术,操作要领和注意事项交底,务使各有关施工人员掌握施工技术,达到质量目的,避免造成不必要的返工。
第六、加强对留设施工缝的淋水养护和覆盖保护,做到7天内经常保持施工缝表面的湿润,做好施工缝的保护工作。
结语:施工缝留设技术目前已经在房建工程项目的施工中得到了广泛的应用,其中施工缝的留设技术主要是要做好施工缝留设位置的选择,施工缝留设技术的各项技术要点以及施工缝留设施工质量的控制等相关工作。
参考文献:
[1]刘东升. 施工缝留设技术分析[J]. 城市建设理论研究,2010(04).
[2]张为民. 房建工程项目中施工缝留设技术分析[J].山西建筑,2011(13).
关键词:施工缝 留设技术 房建工程项目 应用
Abstract: the so-called construction seam is endowed the organization of construction project construction unit in the area for the seam between set. Construction joints and is not a real "sew", it is only after pouring concrete because more than initial set time, and with the first formed between concrete pouring a combination of surface, the surface is combined with construction joints. Combining with the specific engineering examples, from the project construction joints in endowed the set of a position, and then fittest of the application of project construction joints stay put technologies were analyzed, finally the fittest project construction joints in the construction quality control measures for a show.
Keywords: construction joints stay put technology project application endowed
中图分类号:TU74文献标识码:A 文章编号:
前言
在房建工程浇筑整体砼的施工中,由于施工过程中容易受诸多因素的影响,浇筑不能连续完成,需留设施工缝,施工缝的位置应在砼浇筑之前确定,而且应该留设在结构受剪力较小且方便施工的部位。在此基础上,施工人员应严格按规范要求进行,认真了解施工缝的留置及处理,这是确保房建工程施工质量的重要环节。
一、房建工程项目中施工缝的留设位置
房建工程项目中施工缝的留设位置多在受力较小处,受动荷载影响不大的地方,同时施工缝的留设位置应该尽量避开有防水要求的地方,结合大量的工程实践,笔者总结认为房建工程项目中施工缝的留设位置主要有以下几种:
1、柱处的施工缝一般都要留在基础的上部水平面上,梁或吊车梁牛腿的下面。无梁楼板柱帽的下面。施工缝的表面应垂直于构件的轴线。
2、梁板、肋形楼板处的施工缝一般都要和板连成整体的大截面梁,留在板底面以下2-3CM处。当板下有梁托时,留在梁托以下。浇筑单向板时,可留在平行于板的短边的任何位置。有主次梁的,当顺着次梁方面浇时,施工缝留置在次梁跨中1/3范围内。当顺着主梁浇时,应留在主梁同时亦为板跨的中间2/4范围内,应注意施工缝应和相应的轴线垂直,梁板可留企口或垂直缝,不宜留斜槎。
3、地下室及地沟处的施工缝一般都留置在地下室梁板与基础连接处,外墙底板以上和上部梁、板下部2-3CM处可留水平施工缝。
4、箱形基础处的施工缝一般都留置在底板、顶板与外墙的水平施工缝应设在底板顶面以上及顶板度面以下30-50CM为宜,接缝宜设钢板等止水措施。底板与内墙的施工缝可设在底板与内墙交接处,而顶板与内墙的施工缝,位置应视剪力墙拖筋的长短而定,一般100CM以内即可。
5、在较大框架中,如为正方形或为井字梁,或是主次梁分别不是很大,而施工时,混凝土又不可能一次浇筑完毕时,必须设置施工缝。
6、在楼梯的施工中,施工缝留在梯段的三分之一处效果最好,现在都是这么施工,将踏步往上多支几步,这一施工做法也可以方便施工,对于结构没有多大的影响.但在浇筑楼梯混凝土时要格外注意保证梯段负弯矩钢筋的正确位置,如果钢筋被踩下去了,无形之中使楼梯梯段(斜板)的截面有效计算高度,对工程非常不利。另外楼梯进行下一步浇筑混凝土前要将施工缝处要妥善处理。
7、在砖混结构中,如果把施工缝留在圈梁的一半处的这种方法尽量避免出现,组织施工时要合理安排,把施工缝留至变形缝处,实现整体现浇,在临时停水、停电的情况下,可将施工缝留在圈梁的一半处,对结构影响不大(因圈梁本身只是抗震构造要求,增加房屋的整体刚度,不是受力构件)。
二、房建工程项目中应用的施工缝留设技术分析
(一) 施工缝钢丝网的安装
施工缝钢丝网的裁剪应根据各层梁截面和板的厚度而定,网的宽度要比板厚度宽一般为50mm,底部向新浇砼方向弯折。遇到梁筋或板筋位置,即用钢丝剪裁开缺口,以便施工缝钢丝网能将钢筋保护层的空隙封住不跑浆,施工缝钢丝网要安装在竖向定位钢筋靠轴的一侧,施工缝钢丝网的搭接控制在100mm的范围内,施工缝钢丝网安放好以后,即用铁丝绑扎在上下定位钢筋上,楼板面的保护层即用锯出的夹板条压在竖向定位钢筋上,并用铁丝绑扎牢固。上述各步工作做好后,随即检查施工缝钢丝网是否存在偏位和松动的现象,保护层是否合理,如有问题及时纠正。另外,施工缝的钢丝网安装好后,要挂出警示牌或安排一各工人监护,避免人为破坏。
(二)施工缝留设前的各项准备工作
1、施工缝留设位置的选择
各层柱和剪力墙的施工缝则留设在框架梁底位置,在浇筑柱和剪力墙混凝土前,先检查墙柱模板是否牢固,尺寸是否合理,板缝是否密实,模板内的杂物是否清理,清理并要垫好钢筋的保护层,是否待处理完检查合格后才能浇筑混凝土和留设施工缝。
2、施工缝留设位置处的防护
混凝土浇筑完成后,随即派专人对钢丝网外侧漏出或撒落的砼碴及时清理干净,变形的钢筋及时调直复位,浇筑混凝土时,应对施工缝至轴位置已绑扎好的钢筋加予保护,方法是在钢筋面铺上夹板,然后覆盖彩条布,避免人为踏坏钢筋以及施工不慎所撒的砼掉落到梁底和楼板上而增加清理难度。因此,做好、施工缝留设位置处的防护工作,意义重大。
(三)施工缝的处理和砼浇筑
在房建工程项目施工中,应在浇筑楼面混凝土前,检查及清理干净施工缝部位的砼碴和杂物,并用清水进行清洗,充分浇湿接口位置的旧砼,然后在即将接合时,将旧砼表面淋上一层水泥浆。施工缝约1米宽位置要用比楼面砼高一级的砼浇筑,或加膨胀剂,充分振捣密实,并要注意该部位的混凝土级配和砼的坍落度,避免砼离析及坍落度过大。
在浇筑柱、剪力墙混凝土和生成施工缝时,要先用清水将模板充份淋湿,然后墙、柱脚底部用同等标号水泥砂浆浇筑一层约5cm厚左右,浇筑墙、柱混凝土必须要分层浇筑,振捣密实,每层厚度控制在1米左右,严格控制混凝土的坍落度在14~16cm之间。浇筑至梁底位置时,观察如果有浮浆要进行清理干净,然后再用同标号混凝土填至梁底标高,并在混凝土表面均匀撒上干净碎石子或在混凝土终凝后进行凿毛。墙、柱混凝土浇筑完成后,随即检查调整墙、柱钢筋,清理干净沾污在钢筋表面和模板表面的砼浆,进而做好施工缝处的各项处理工作。
(四)施工缝和砼的养护
施工缝和砼的养护是保证混凝土的设计强度和防止混凝土龟缩开裂的关键,有条件的要蓄水养护,无法蓄水养护时即指定专人淋水养护,经常保持施工缝和砼表面的湿润。另外,在施工缝位置要用塑料薄膜加予覆盖,同时养护期不得少于7天。
三、房建工程项目中施工缝的留设施工质量控制举措
结合一些具体的工程实践,笔者认为,在房建工程项目中做好施工缝的留设施工质量的控制工作,还需要做好如下几点:
第一、指定专职责任人,由其负责施工缝的留设施工质量控制工作的落实,并进行施工全过程的监督。
第二、竖持严格的检查制度,施工缝的钢丝网安装完成后,在进行楼面钢筋检查的同时对钢丝进行检查,发现问题及时纠正,复检合格并交由监理验收后才交由混凝土施工人員进行浇筑施工。
第三、加强混凝土施工过程的监控,务必振捣密实,混凝土表面待收水后进行刮平和打磨反砂。
第四、在施工缝约1米的部位,必须严格按照规范的房建工程缝留设施工方法的施工要领和步骤进行操作,并全过程加强监督实施,务必达到相关的质量要求。
第五、对有关的施工管理人员和实际操作人员进行施工方案交底以及施工技术,操作要领和注意事项交底,务使各有关施工人员掌握施工技术,达到质量目的,避免造成不必要的返工。
第六、加强对留设施工缝的淋水养护和覆盖保护,做到7天内经常保持施工缝表面的湿润,做好施工缝的保护工作。
结语:施工缝留设技术目前已经在房建工程项目的施工中得到了广泛的应用,其中施工缝的留设技术主要是要做好施工缝留设位置的选择,施工缝留设技术的各项技术要点以及施工缝留设施工质量的控制等相关工作。
参考文献:
[1]刘东升. 施工缝留设技术分析[J]. 城市建设理论研究,2010(04).
[2]张为民. 房建工程项目中施工缝留设技术分析[J].山西建筑,2011(13).