1992年8月,渭河二号洪峰使交口抽渭工程枢纽进水闸闸墩和护岸发生裂缝,闸底板下大面积掏空,工程告急,危在旦夕。省上各级领导闻讯后,立即组织有关专家、设计人员多次深入现场,提出抢险加固方案,解决技术难题,落实资金。交口管理局全力以赴,领导与全体施工人员斗洪水、战严寒,发挥了敢打硬仗的拼搏精神,终使抢险加固工程于1993年4月18日提前12天胜利竣工。1993年12月29日通过省上验收,评为“优良”工程。并得到省水利厅通报表扬。如今西楼枢纽又以崭新的面貌,吞吐着渭河水,滋润着渭北广袤百里的原野。
In August 1992, the flood peak of Weihe River caused the cracks in the gate pier and revetment at the crossings of Wei River pumping project, and the large area under the sluice floor was hollowed out. The project was in an emergency and was in danger. After the provincial leaders at all levels heard the news, they immediately organized relevant experts and designers to conduct in-depth visits to the site on many occasions, proposed measures for reinforcement and reinforcement, solved technical problems and implemented funds. Jiao Kou administration go all out to lead the fight with all the construction workers flood, war cold, played dare to fight hard fighting spirit, and finally to rescue and reinforcement project on April 18, 1993 victory in 12 days ahead of schedule. December 29, 1993 passed the provincial acceptance, as “excellent” project. And get the provincial Water Conservancy Bulletin praised. West hub now with a brand new look, throughput Weihe water, moisten the vastness of Weibei Barry wilderness.