Risk factors for progressive ischemic stroke A retrospective analysis

来源 :中国神经再生研究(英文版) | 被引量 : 0次 | 上传用户:wywinnie1105
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
BACKGROUND: Progressive ischemic stroke has higher fatality rate and disability rate than common cerebral infarction, thus it is very significant to investigate the early predicting factors related to the occurrence of progressive ischemic stroke, thc potential pathological mechanism and the risk factors of early intervention for preventing the occurrence of progressive ischemic stroke and ameliorating its outcome.OBJECTIVE: To analyze the possible related risk factors in patients with progressive ishcemic stroke, so as to provide reference for the prevention and treatment of progressive ishcemic stroke.DESIGN: A retrospective analysis.SETTING: Department of Neurology, General Hospital of Beijing Coal Mining Group.PARTICIPANTS: Totally 280 patients with progressive ischemic stroke were selected from the Department of Neurology, General Hospital of Beijing Coal Mining Group from March 2002 to June 2006, including 192 males and 88 females, with a mean age of (62±7) years old. They were all accorded with the diagnostic standards for cerebral infarction set by the Fourth National Academic Meeting for Cerebrovascular Disease in 1995, and confired by CT or MRI, admitted within 24 hours after attack, and the neurological defect progressed gradually or aggravated in gradients within 72 hours after attack, and the aggravation of neurological defect was defined as the neurological deficit score decreased by more than 2 points. Meanwhile,200 inpatients with non-progressive ischemic stroke (135 males and 65 females) were selected as the control group.METHODS: After admission, a univariate analysis of variance was conducted using the factors of blood pressure, history of diabetes mellitus, fever, leukocytosis, levels of blood lipids, fibrinogen, blood glucose and plasma homocysteine, cerebral arterial stenosis, and CT symptoms of early infarction, and the significant factors were involved in the multivariate non-conditional Logistic regression analysis.MAIN OUTCOME MEASURES: Results of the univariate analysis of variance of the factors related to progressive ischemic stroke; Results of the multivariate regression analysis.RESULTS: All the 480 patients were involved in the analysis of results. ① Results of the univariate analysis variance: There were significantly more patients with fever, leukocytosis, history of diabetes mellitus, cerebral arterial stenosis and CT symptoms of early infarction in the progressive ischemic stroke group than in the control group (P < 0.01); The levels of blood glucose and fibrinogen in the progressive ischemic stroke group were significantly higher than those in the control group, while the level of blood pressure was significantly lower than that in the control group (P < 0.05 - 0.01). ② Results of the multivariate Logistic regression analysis: The independent predicting factors for progressive ischemic stroke were history of diabetes mellitus, fever, leukocytosis, cerebral arterial stenosis, CT symptoms of early infarction, blood glucose and blood pressure (OR =2.61, 2.96, 3.79, 1.03, 3.57, 2.68, 95% CI 0.92 - 3.59, P <0.05 - 0.01).CONCLUSION: History of diabetes mellitus, fever, leukocytosis, levels of blood pressure, blood glucose,cerebral arterial stenosis and CT symptoms of early infarction are the risk factors for progress ischemic stroke
其他文献
随着我国市场经济的不断发展和人民生活水平的不断提高,我国建设项目行业的发展也是极为迅速。财务管理和监督作为建设项目中的重要组成部分,在控制施工成本、保证施工质量等方
随着社会的飞速发展,能源的紧缺,环境的严重污染,人们逐步认识到节能与环保的重要性,节能也逐步进人每个人的思想当中。我是节能设计处于起步阶段,存在较多的问题待解决。本文主要
本文作者评述了国内外建筑抗震鉴定与加固的管理规定,剖析了我国现行规范和规程中有关设防目标、评估方法、加固技术措施等关键问题,针对结构设防目标、剩余寿命、加固方法等重
本文作者介绍了工民建施工安全管理的特点,分析了我国工民建安全生产现状,提出了工民建建筑施工安全体系化管理的措施。
建筑产品也是使用价值和价值的统一体,由于建筑企业各种生产要素都集结在施工现场,建筑产品的价值和使用价值的实现,主要是在施工现场完成的。因此,施工现场管理是建筑企业管理的
本文作者介绍了桩基工程施工中桩基的选择及工民建中桩基施工前期准备工作,分析了柱基础的施工过程,指出了工民建中桩基工程灌注桩的特点。
针对煤矿顺槽锚网体系中的托梁进行了力学特征描述。研究显示托梁的主要作用不是依靠承托而是补强顶板的岩体抗拉力来提高顶板稳定性。指出了一般托梁设计注重承托面大而忽视
本文作者分析我国当前建筑工程造价管理的现状及存在的问题,提出了提高工程造价管理水平的措施。
土木工程结构常用到两种材料,即钢筋混凝土以及结构钢,对于土木工程来说,不仅要从结构特性的角度考虑,还要考虑施工的成本有效性以及施工有效性。本文就分析了钢结构在土木工程中
本文作者主要分析了工民建施工管理的现状,对其存在的问题提出了相应的解决办法。