大连南部滨海大道工程主桥锚碇基础采用超大沉箱结构,单个沉箱尺寸为69m×44m×17m,重量约26000t。超大沉箱远距离拖航,途经黄渤海交界处的老铁山水道,施工难度非常大。在拖航实施中,采用“一主拖+两伴拖+两顶推”的方式,缜密选择最佳航线、精准预报拖航气象、及时调整拖航姿态,最终确保了超大沉箱拖航任务顺利完成。
The anchorage foundation of the main bridge of the South Coastal Road Project in Dalian adopts an extra-large caisson structure. The size of a single caisson is 69m × 44m × 17m and the weight is about 26000t. Large caisson long-distance towing, via the junction of the Yellow Sea and the old railway tunnel, construction is very difficult. In the implementation of the towing, adopting the method of “one main towing + two towing towing + two pushing”, careful selection of the best route, accurate prediction of the towing weather, timely adjustment of the towing attitude and finally ensuring that the large caisson towed The task is completed successfully.