炭窑口硫铁矿位于内蒙古自治区巴彦淖尔盟潮格旗境界,距东南方向临河县城62公里,临河至炭窑口的国家公路穿越矿区及生活区。该矿是目前国家重点开发的矿区之一,矿山规模为采选150万吨/年,分期实施。矿山开采和选矿工程设计分两期建设,前期工程已于1984年国庆前夕完成,现已转入联动试车阶段。我院负责设计的矿山生活区道路工程也是1984年完成的,全线总长6.6公里,路面面积48043米~2。经半年多紧张施工,干线(总图中1~9~#线)已完工,部份路段已开放交通,投入正常运行后证明,路基、路面工程质量较好,车辆运行效果符合设计规定,各项质
The coal kiln mouth pyrite is located in the boundary of Chaogeqi, Bayannaoer League, Inner Mongolia Autonomous Region, and is 62 kilometers away from Linhe County in the southeast direction. The national road from Linhe to Jiaoyakou passes through the mining area and living area. The mine is currently one of the country’s key mining areas. The mining scale is 1.5 million tons per year, which is implemented in phases. The mining and ore dressing project was designed in two phases. The preliminary project was completed on the eve of National Day in 1984 and has now been transferred to the commissioning phase. The road project of the mine living area that our institute was responsible for was also completed in 1984, with a total length of 6.6 kilometers and a road surface area of 48,043 meters~2. After more than half a year of intensive construction, the main lines (1-9 lines in the general map) have been completed, and some of the road sections have been opened to traffic. After normal operation, it is proved that the quality of the roadbed and road surface works well, and the vehicle operation effect meets the design requirements. Quality