琉璃河水泥厂在加强材料定額管理,推行送料制后,材料計划的准确性虽有著显提高,供应工作也开始由被动走向主动,但由于对設备部件、配件的实体規格了解不透,对設备检修用料的供应,还感到有些棘手。如該厂加热机小軸,实物規格为32×3320mm,在訂貨时,由于不了解实物实际长度,均訂了4米以上的,做一根有余,做两根不足,造成了浪费。收尘器用Φ159mm无縫管,3~4年才更換一次。由于对再装数量和使用期限心中无数,
After the Liulihe Cement Plant strengthened the quota management of materials and implemented the feeding system, the accuracy of the material plan was significantly improved, and the supply work began to passively take the initiative, but due to the poor understanding of the physical specifications of the equipment components and accessories, The supply of equipment maintenance materials still feels a bit tricky. Such as the factory heating machine small shaft, physical specifications for the 32 × 3320mm, when ordering, because they do not understand the actual length of the actual, are booked more than 4 meters, do more than one, do two shortcomings, causing a waste. The dust collector uses a Φ159mm seamless tube and is replaced only once in 3 to 4 years. Due to the countless number of reloads and the duration of use,