施工图审查的主要内容是:强制性条文的执行,确保安全度、及政策性条文的实施,审查的依据是现行规范及政府政策要求。(以下主要按新规范要求审查问题)一、体系的控制1、关于异形柱框架及框剪的应用。基于济南地区除平阴外均为6度区,因此按天津规程采用其7度的限值,及相应所有构造,肢的高宽比<4,梁高≥400mm,荷重比津标略高不
The main contents of the construction drawing review are: the implementation of mandatory provisions to ensure safety, and the implementation of the policy provisions, the review is based on current norms and government policy requirements. (The following mainly according to the requirements of the new code review problems) First, the system control 1, on the special-shaped column frame and frame shear application. Based on the 6-degree zone in Jinan except for Pingyin, the 7-degree limit and the corresponding aspect ratio of the limbs are used according to the Tianjin regulations <4, the beam height is ≥400mm, and the load is slightly higher than the Tianjin standard