目前,我县第二批网改工程已全部完工,第三批工程正在进行.为了赶时间,抢速度,乡站把大部分村电工组织到农网改造工作中去,对整改后配电台区的管理放松了,出现了个别线路人为破坏、被盗、私拉乱接,还有表计烧坏无人管、线路接地、漏电保护器不运行等现象.由于这些因素的存在,个别由区低压线损率由整改后的12%增加到16%,对减轻群众电费负担,增加企业效益出现了不可忽略的负面影响.因此,在搞好农网改造工作的同时,加强对配电台区的管理刻不容缓,必须做到改造与管理两手抓,两手都要硬.
At present, the second batch of network reform projects in our county has been completed, and the third batch of projects is underway. In order to hurry up and grab speed, the township station organizes most of the village electricians to go to the rural power grid reconstruction work, and to the rectification rear distribution station. The management of the district was relaxed, and there were phenomena such as the destruction of individual lines, theft, private connections, and the destruction of meters and wires, the grounding of the lines, and the failure of leakage protection devices. Due to the existence of these factors, The low-voltage line loss rate in the district was increased from 12% after rectification to 16%, which has reduced the burden on the people’s electricity bills and increased the company’s profits. It has a negative impact that can not be ignored. Therefore, while improving the rural power grid reconstruction work, strengthen the power distribution station The management of the district must not be delayed. Both transformation and management must be done. Both hands must be hard.