论文部分内容阅读
6.对出口盆景的生产要求生产设施和生产措施必须符合下列要求: a)盆景植物出口前必须在生产设施的无土介质(条款6.4规定)上至少种植4个月,使用的介质必须是未使用过的。 b)移植到无土介质之前,所有植物的根须冲洗干净,不能带有土壤、沙、厩肥、堆肥、树皮和树木枝叶等有关杂物,并按内吸性杀线剂药剂标注的要求进行浸泡处理,确保盆景植物和生长介质不再感染植物有害生物、沙、土壤、泥、厩肥、堆肥、树皮和树木枝叶等。 c)生产设施必须: i.结构坚固,进出口处具有防虫网、可自动关闭的双重门,地板坚硬不透水(如水泥、陶瓷、混凝土、钢板、砖等),便于排水,易于消毒; ii.与附近带土的设施隔离; iii.有供盆景生产的高平台。
6. Production Requirements for Export Bonsai Production facilities and production measures must meet the following requirements: a) Bonsai plants must be planted for at least 4 months before they are exported to soilless media (Clause 6.4) of the production facility, and the medium used must be unimpregnated Used before. b) Before transplanting into soilless medium, all the plants must be rinsed clean and can not carry the soil, sand, manure, compost, bark and branches of trees and other debris, Immersion treatment to ensure that bonsai plants and growing media are no longer infected with plant pests, sand, soil, mud, manure, compost, bark and branches and leaves of trees. c) The production facilities must: i. Strong structure, with anti-insect nets at entrance and exit, double doors that can be closed automatically, the floor is hard and impervious (such as cement, ceramics, concrete, steel plate, brick, etc.) Isolation from nearby soil facilities iii. High platform for bonsai production.