论文部分内容阅读
介绍了吉林市二水厂扩建工程的设计特点及主要设计参数 ,结合运行状况分析了工艺设计中存在的一些问题。
The design features and main design parameters of the expansion project of No.2 Waterworks in Jilin City are introduced. Some problems existing in the process design are analyzed based on the operation status.