1.能源管理典型的高岭土生产流程是从露天矿开始的,靠300磅/时~2的标准水力软管从矿脉采出。在采矿场和由采矿场把矿砂输送出去要消耗大量能量。为了每年生产250万吨高岭土,在选矿时还会继续消耗能量,而且在这个过程中,会消耗大部分能量。因此,必须优先考虑其节能问题。本文着重说明这方面所做的工
1. Energy Management A typical kaolin production process starts with an open pit mine and is mined from a vein using a standard 300 hpa / h ~ 2 hydraulic hose. It takes a lot of energy to transport the ore in the mining field and by the mining field. In order to produce 2.5 million tons of kaolin per year, energy will continue to be consumed during mineral processing and most of the energy will be consumed in the process. Therefore, priority must be given to its energy saving issues. This article highlights the work done in this area