论文部分内容阅读
2003年被派到伊朗,作为中国电工设备总公司现场副代表,参与当时正在修建的德黑兰地铁的高低压供配电系统的工作,历时三年。
In 2003, he was sent to Iran to work as an on-site deputy representative of China Electrotechnical Equipment Corporation and participate in the high and low voltage power supply and distribution system of Tehran Subway currently under construction, which lasted for three years.