论文部分内容阅读
西藏日喀则谢通门县荣河电站 ,地处荣河出口与雅江交汇的开阔地带 ,海拔高程 4 2 0 0 m左右 ,开发方式为高山峡谷中引水式电站 ,受泥石流形成的堆积物扩散的威胁。电站设计水头 1 1 0 m,引水渠道长 2 80 0 m,比降 1 / 650 ,矩形渠道尺寸 1 .2× 1 .6m,流量 1 .8m3/ s。渠道沿南
Tibet Shigatse Xietongmen County Ronghe Power Station is located in the open area where the Ronghe River exports meet with the Ya River at an elevation of about 4200m. The development mode is that the diversion power plant in the mountain valley is threatened by the proliferation of debris caused by the debris flow . The water head of the hydropower station is 110 m long and the water diversion channel is 2805 m long, with a specific gravity of 1/650. The size of the rectangular channel is 1.2x1.6m and the flow rate is 1.8m3 / s. Channel along the south