论文部分内容阅读
八一钢厂铁路运输系统新建和改造的过程中,信号控制系统是非常重要的一部分工程任务,信号系统的技术水平直接影响着铁路运输系统的运输效率和安全。在方案设计过程中,将厂内新站建设和旧站改造通盘考虑,采用区域联锁的设计方案,联锁设备使用三取二容错计算机和全电子执行设备,实现了全电子计算机联锁,替代了传统的继电器执行部件,从安全性、投资和维护几个方面对整体系统做出评估提出设计方案。
The signal control system is a very important part of the engineering task in the process of building and transforming the rail transport system of August 1 Steel Plant. The technical level of the signaling system directly affects the transport efficiency and safety of the railway transport system. In the program design process, the new station construction and the transformation of the old station plant overall consideration, the use of regional interlocking design, interlocking equipment using three take two fault-tolerant computer and electronic implementation of the device to achieve the full electronic computer interlocking, Instead of the traditional relay actuator, the overall system is evaluated in terms of safety, investment and maintenance to propose a design solution.