摘要:滑模技术是我国现浇混凝土结构工程中机械化程度高、施工速度快、现场场地占用少、结构整体性强、抗震性能好、安全作业有保障、环境于经济综合效益显著的一种施工技术,通常简称“滑模”。文章基于工程实践,介绍了该技术在水利水电工程中的应用,以供参考。
关键词:水利水电工程;滑模;施工
Abstract: the sliding mode technology is our country cast-in-situ concrete structure engineering of high mechanization degree, construction speed is quick, field site takes up less, structure integrity, strong anti-seismic performance good, safe operations for security, environmental comprehensive economic benefit is remarkable in a construction technology, often referred to as the sliding mode ". Based on the engineering practice, this paper introduces the technology in water conservancy and hydropower engineering application, for reference.
Keywords: water conservancy and hydropower projects; Sliding mode; construction
中图分类号: F407.9 文献标识码:A 文章编号:
为了防止江河上游水土流失的严重化,在江河中下游还要治理蓄滞洪区和湖泊、洼地,必要时要退耕还林还湖,平垸行洪、移民建镇。为了改变防洪的被动局面,必须对水土资源统一进行规划,有舍有保,既要保证堤防能抗御一定标准的设计洪水,在超标准的大洪水下还要给洪水的出路让出一些农田以容蓄洪水,避免灾害的扩大,减少人民生命财产的损失.使人、地、水能协调相处。因此要加强水利水电工程建设。滑模施工技术是混凝土工程和钢筋混凝土工程中机械化程度高、施工速度快、场地占用少、安全作业有保障、综合效益显著的一种施工方法。在水利水电工程中合理应用滑模技术。可以缩短了工期,节约成本。所以滑模技术在水利水电工程中得到了广泛应用。
一、滑模施工特点
(1)滑模施工具有以下几大优点:①不需设水平施工缝,施工连续性好,结构整体性强;②施工进度快,正常情况下日平均滑升高度在2.5m左右;③施工过程中,辅助性材料消耗少;④混凝土成形外观平整度高、缺陷处理量小。
(2)滑模施工存在的不足之处:滑模施工具有钢筋、埋件安装、混凝土浇筑以及模板滑升等各工序平行交叉作业的特点,相互之间配合、衔接是否到位,直接关系到滑模施工质量的好坏,稍有控制不当,就易出现各种质量问题甚至质量事故。因此,要确保混凝土的施工质量,选择有经验且素质较高的施工队伍,加强施工过程中的质量监督与管理,在滑模施工中就显得尤为重要。
二、滑模施工工艺
(一)工艺流程
钢筋绑扎及固定埋件→浇筑混凝土→滑升→模板调平→钢筋绑扎→滑升→循环作业。
(二)始滑
内门槽独立模板外模组装好后,清除模内杂物,即可扎始滑段的钢筋和固定埋件,对基础面进行施工缝处理,最后关滑模模板。经检查平台组装符合要求,液压、电气、运输运转正常后才可浇灌混凝土。始滑第一层混凝土捣实厚度为30cm,滑升2个行程(5~6cm),依此循环,直到将混凝土浇至模板上口,即完成始滑。
(三)绑扎钢筋
模板定位检查完成后,即可进行钢筋的安装,塔吊垂直运输钢筋。前期钢筋绑扎从模板底部一直绑扎至下托梁下部,起滑后,采用边滑升边扎钢筋穿插作业方式。水平钢筋超前混凝土浇筑30cm左右。竖向钢筋接头采用直螺纹套筒連接。水平向钢筋接头采用搭接,搭接长度为40倍钢筋直径。竖立筋接头与相邻水平环筋接头错开,且距离大于1.Om。同一纵剖面的水平向钢筋接头根数不得超过全部根数的1/4。水平向钢筋放置在纵向钢筋的外侧,交叉处均用铅丝绑扎。在同一横剖面内的纵向钢筋接头根数不得超过全部纵向根数的1/4。钢筋保护层厚度lOmm。
(四)混凝土的浇筑与模体滑升
混凝土每次浇筑高度30cm,每层浇筑的间隔时间不超过2h。混凝土用高频振捣器振捣,插入深度不超过下层混凝土顶面以下5cm,不碰触钢筋和模板。浇灌和振捣顺序采取对半对称浇灌,顺、逆时针方向交错进行;浇上层混凝土时,下层必须处于塑性状态,即下层混凝土不超过初凝时间。每次操作平台滑升高度30cm,白天间隔时间控制2h以内,夜间控制在3h以内,低温要适当延长时间,总之出模强度要控制在0.4~0.5MPa,塔机入模混凝土坍落度控制在35cm,泵送混凝土坍落度控制在11-13cm,严禁随便加水。除正常滑升外,还必须保证每小时松模一次。出模混凝土要用与混凝土配合比相同之水泥砂浆进行表面修饰,配合比要准确,每次相同,以保证修饰表面色泽一致。
(五)混凝土养护
混凝土浇筑后要及时进行养护,保持混凝土表面湿润,养护时间不少于14d;可在辅助盘上安置洒水管喷水对混凝土进行养护;养护时水压不宜过大,避免养护水冲坏混凝土表面,养护时应指定专人负责控制,在模板滑升过程中适时进行操作管理。
三、施工精度控制
(一)滑模水平控制
①利用千斤顶的同步器进行水平控制;②利用水准管测量,进行水平检查。
(二)滑模垂直控制
①滑升过程中,用两台经纬仪昼夜进行垂直观测,每滑升90cm观测一次并做好记录;②在关键部位悬挂垂线,测量队每天两次对滑模进行垂直度观测,以确保垂直度符合设计要求。
(三)滑模中线控制
在关键部位悬挂垂线进行中心测量控制,同时,应每天两次对模板边线进行测量监控,发现
(四)纠偏
①千斤顶垫铁纠偏法利用钢垫板将千斤顶底座偏移方向的一侧垫高,迫使千斤顶连同支承杆偏离偏移方向,带动平台及模板系统作定向滑升,从而达到纠偏、纠扭的目的。②改变模板坡度平台、模板滑升到适当高度后,将模板坡度朝纠偏方向调校,然后浇筑混凝土,再继续滑升时,利用新浇混凝土的导向作用,迫使平台及模板系统偏离原滑升方向,向着纠偏方向滑升,从而达到纠偏、纠扭之目的。③顶轮纠偏法是利用已经出模且具有一定强度的混凝土墙体作为支点,通过改变纠偏装置的位置而产生一个外力,在滑升过程中逐步顶移平台及模板系统,以达到纠偏目的。
四、滑模施工中常见问题及处理措施
滑模施工中经常出现的问题有:滑模操作盘倾斜、滑模盘平移、扭转、模板变形、混凝土表面缺陷、爬杆弯曲等。其产生的根本原因在于千斤顶工作不同步,荷载不均匀,浇筑不对称,纠偏过急等。因此,在施工中首先要把好质量关,加强观测检查工作,确保良好运行状态,发现问题及时解决。
(1)纠偏。利用千斤顶自身纠偏,即关闭五分之一的千斤顶,然后滑升2~3个行程,再打开全部千斤顶滑升2~3个行程,反复数次逐步调整至设计要求。并针对各种不同情况,施加一定外力给予纠偏。所有纠偏工作不能操之过急,以免造成混凝土表面拉裂、死弯、滑模变形、爬杆弯曲等事故发生。
(2)模板变形处理。对部分变形较小的模板采用撑杆加压复原,变形严重时,将模板拆除修复。
(3)混凝土表面缺陷处理。采用局部立模,补上比原混凝土标号高一级的细骨料混凝土并用抹子抹平。
(4)爬杆弯曲处理。爬杆弯曲时,采用加焊钢筋或斜支撑。弯曲严重时切断,接人爬杆重新与下部爬杆焊接,并加焊“人”字型斜支撑。
五、滑模施工技术应用效果评价
(1)采用滑模施工能够连续进行混凝土浇筑,减少了常规模板施工时各层面之间的重复工作量,大大节约了周转材料和劳动力投入,有效降低了施工成本。
(2)提高了施工质量,滑模施工的连续性,减少了施工缝面,解决了常规模板施工易出现的错台、挂帘、混凝土表面气泡等质量问题。对出模的混凝土及时收光,保证了混凝土表面平整、光滑。
(3)加快了施工进度,根据现场施工表明,气温在20℃以上时,混凝土浇筑速度分别可以达到0.7m/h,对施工工期起到绝对的保证,且施工质量与检验结果对比,超出组合钢模预期施工效果。
参考文献:
【1】高宝军.溪洛渡水电站砼边坡工程滑模施工工艺【J】.科技与企业,2011(11X).
【2】肖桂蓉.滑模施工工艺在水利工程建设中的应用【J】.科技与生活,2011(7).
【3】李新平.水利水电工程施工中的滑模技术【J】.中国新技术新产品,2010(18).
【4】赵宝玉.水利水电工程的滑模施工【J】.轻工设计,2011(6)
关键词:水利水电工程;滑模;施工
Abstract: the sliding mode technology is our country cast-in-situ concrete structure engineering of high mechanization degree, construction speed is quick, field site takes up less, structure integrity, strong anti-seismic performance good, safe operations for security, environmental comprehensive economic benefit is remarkable in a construction technology, often referred to as the sliding mode ". Based on the engineering practice, this paper introduces the technology in water conservancy and hydropower engineering application, for reference.
Keywords: water conservancy and hydropower projects; Sliding mode; construction
中图分类号: F407.9 文献标识码:A 文章编号:
为了防止江河上游水土流失的严重化,在江河中下游还要治理蓄滞洪区和湖泊、洼地,必要时要退耕还林还湖,平垸行洪、移民建镇。为了改变防洪的被动局面,必须对水土资源统一进行规划,有舍有保,既要保证堤防能抗御一定标准的设计洪水,在超标准的大洪水下还要给洪水的出路让出一些农田以容蓄洪水,避免灾害的扩大,减少人民生命财产的损失.使人、地、水能协调相处。因此要加强水利水电工程建设。滑模施工技术是混凝土工程和钢筋混凝土工程中机械化程度高、施工速度快、场地占用少、安全作业有保障、综合效益显著的一种施工方法。在水利水电工程中合理应用滑模技术。可以缩短了工期,节约成本。所以滑模技术在水利水电工程中得到了广泛应用。
一、滑模施工特点
(1)滑模施工具有以下几大优点:①不需设水平施工缝,施工连续性好,结构整体性强;②施工进度快,正常情况下日平均滑升高度在2.5m左右;③施工过程中,辅助性材料消耗少;④混凝土成形外观平整度高、缺陷处理量小。
(2)滑模施工存在的不足之处:滑模施工具有钢筋、埋件安装、混凝土浇筑以及模板滑升等各工序平行交叉作业的特点,相互之间配合、衔接是否到位,直接关系到滑模施工质量的好坏,稍有控制不当,就易出现各种质量问题甚至质量事故。因此,要确保混凝土的施工质量,选择有经验且素质较高的施工队伍,加强施工过程中的质量监督与管理,在滑模施工中就显得尤为重要。
二、滑模施工工艺
(一)工艺流程
钢筋绑扎及固定埋件→浇筑混凝土→滑升→模板调平→钢筋绑扎→滑升→循环作业。
(二)始滑
内门槽独立模板外模组装好后,清除模内杂物,即可扎始滑段的钢筋和固定埋件,对基础面进行施工缝处理,最后关滑模模板。经检查平台组装符合要求,液压、电气、运输运转正常后才可浇灌混凝土。始滑第一层混凝土捣实厚度为30cm,滑升2个行程(5~6cm),依此循环,直到将混凝土浇至模板上口,即完成始滑。
(三)绑扎钢筋
模板定位检查完成后,即可进行钢筋的安装,塔吊垂直运输钢筋。前期钢筋绑扎从模板底部一直绑扎至下托梁下部,起滑后,采用边滑升边扎钢筋穿插作业方式。水平钢筋超前混凝土浇筑30cm左右。竖向钢筋接头采用直螺纹套筒連接。水平向钢筋接头采用搭接,搭接长度为40倍钢筋直径。竖立筋接头与相邻水平环筋接头错开,且距离大于1.Om。同一纵剖面的水平向钢筋接头根数不得超过全部根数的1/4。水平向钢筋放置在纵向钢筋的外侧,交叉处均用铅丝绑扎。在同一横剖面内的纵向钢筋接头根数不得超过全部纵向根数的1/4。钢筋保护层厚度lOmm。
(四)混凝土的浇筑与模体滑升
混凝土每次浇筑高度30cm,每层浇筑的间隔时间不超过2h。混凝土用高频振捣器振捣,插入深度不超过下层混凝土顶面以下5cm,不碰触钢筋和模板。浇灌和振捣顺序采取对半对称浇灌,顺、逆时针方向交错进行;浇上层混凝土时,下层必须处于塑性状态,即下层混凝土不超过初凝时间。每次操作平台滑升高度30cm,白天间隔时间控制2h以内,夜间控制在3h以内,低温要适当延长时间,总之出模强度要控制在0.4~0.5MPa,塔机入模混凝土坍落度控制在35cm,泵送混凝土坍落度控制在11-13cm,严禁随便加水。除正常滑升外,还必须保证每小时松模一次。出模混凝土要用与混凝土配合比相同之水泥砂浆进行表面修饰,配合比要准确,每次相同,以保证修饰表面色泽一致。
(五)混凝土养护
混凝土浇筑后要及时进行养护,保持混凝土表面湿润,养护时间不少于14d;可在辅助盘上安置洒水管喷水对混凝土进行养护;养护时水压不宜过大,避免养护水冲坏混凝土表面,养护时应指定专人负责控制,在模板滑升过程中适时进行操作管理。
三、施工精度控制
(一)滑模水平控制
①利用千斤顶的同步器进行水平控制;②利用水准管测量,进行水平检查。
(二)滑模垂直控制
①滑升过程中,用两台经纬仪昼夜进行垂直观测,每滑升90cm观测一次并做好记录;②在关键部位悬挂垂线,测量队每天两次对滑模进行垂直度观测,以确保垂直度符合设计要求。
(三)滑模中线控制
在关键部位悬挂垂线进行中心测量控制,同时,应每天两次对模板边线进行测量监控,发现
(四)纠偏
①千斤顶垫铁纠偏法利用钢垫板将千斤顶底座偏移方向的一侧垫高,迫使千斤顶连同支承杆偏离偏移方向,带动平台及模板系统作定向滑升,从而达到纠偏、纠扭的目的。②改变模板坡度平台、模板滑升到适当高度后,将模板坡度朝纠偏方向调校,然后浇筑混凝土,再继续滑升时,利用新浇混凝土的导向作用,迫使平台及模板系统偏离原滑升方向,向着纠偏方向滑升,从而达到纠偏、纠扭之目的。③顶轮纠偏法是利用已经出模且具有一定强度的混凝土墙体作为支点,通过改变纠偏装置的位置而产生一个外力,在滑升过程中逐步顶移平台及模板系统,以达到纠偏目的。
四、滑模施工中常见问题及处理措施
滑模施工中经常出现的问题有:滑模操作盘倾斜、滑模盘平移、扭转、模板变形、混凝土表面缺陷、爬杆弯曲等。其产生的根本原因在于千斤顶工作不同步,荷载不均匀,浇筑不对称,纠偏过急等。因此,在施工中首先要把好质量关,加强观测检查工作,确保良好运行状态,发现问题及时解决。
(1)纠偏。利用千斤顶自身纠偏,即关闭五分之一的千斤顶,然后滑升2~3个行程,再打开全部千斤顶滑升2~3个行程,反复数次逐步调整至设计要求。并针对各种不同情况,施加一定外力给予纠偏。所有纠偏工作不能操之过急,以免造成混凝土表面拉裂、死弯、滑模变形、爬杆弯曲等事故发生。
(2)模板变形处理。对部分变形较小的模板采用撑杆加压复原,变形严重时,将模板拆除修复。
(3)混凝土表面缺陷处理。采用局部立模,补上比原混凝土标号高一级的细骨料混凝土并用抹子抹平。
(4)爬杆弯曲处理。爬杆弯曲时,采用加焊钢筋或斜支撑。弯曲严重时切断,接人爬杆重新与下部爬杆焊接,并加焊“人”字型斜支撑。
五、滑模施工技术应用效果评价
(1)采用滑模施工能够连续进行混凝土浇筑,减少了常规模板施工时各层面之间的重复工作量,大大节约了周转材料和劳动力投入,有效降低了施工成本。
(2)提高了施工质量,滑模施工的连续性,减少了施工缝面,解决了常规模板施工易出现的错台、挂帘、混凝土表面气泡等质量问题。对出模的混凝土及时收光,保证了混凝土表面平整、光滑。
(3)加快了施工进度,根据现场施工表明,气温在20℃以上时,混凝土浇筑速度分别可以达到0.7m/h,对施工工期起到绝对的保证,且施工质量与检验结果对比,超出组合钢模预期施工效果。
参考文献:
【1】高宝军.溪洛渡水电站砼边坡工程滑模施工工艺【J】.科技与企业,2011(11X).
【2】肖桂蓉.滑模施工工艺在水利工程建设中的应用【J】.科技与生活,2011(7).
【3】李新平.水利水电工程施工中的滑模技术【J】.中国新技术新产品,2010(18).
【4】赵宝玉.水利水电工程的滑模施工【J】.轻工设计,2011(6)