建筑工程施工测量贯穿于整个建筑施工的全过程,放样精度对建筑工程质量和施工进度都起着十分重要的作用,测量放样的成果,必须做到准确无误。因为各施工部门都要依据所测量的点线去施工,放线一旦有误,必将使开挖、打桩、立模、钢筋绑扎以及混凝土等作业处于不正确的设计位置,造成施工错误,给甲乙双方带来重大经济损失。下面分析了在建筑工程定位放样过程中如何减少测量的误差。
Building construction measurement throughout the entire construction of the entire process of setting out the precision of the construction quality and construction progress are all very important role in measuring the results of the lofting must be accurate. Because all construction departments should be based on the measured line to go to construction, pay off once in error, will make excavation, piling, vertical formwork, steel banding and concrete and other operations in the incorrect design position, resulting in construction errors, to Both A and B have brought significant economic losses. The following analysis of how to reduce the measurement error in the positioning of construction projects.