目前在我们公路基本建设中,经常碰到的问题是:混凝土配合比设计赶不上施工的需要,因为水泥运到工地后,按照正规的施工方法试验、设计,要两个月时间才能运用到工程中去。这样,很多的施工单位都来不及等待28天结果便进行施工。因此制配的混凝土不是没有充分利用水泥的活性,就是水泥标号过低,造成水泥浪费和严重的质量事故。当前,公路钢筋混凝土桥梁逐步走向预制装配化的快速施工,施工单位希望提早得出混凝土正确的强度来保证工程质量
Currently in our road infrastructure, often encountered the problem is: concrete mix design can not keep up with the construction needs, because the cement shipped to the site, in accordance with the normal construction methods of testing, design, it takes two months to be applied to the project go with. In this way, many construction companies have time to wait 28 days for construction. Therefore, the preparation of concrete is not not fully utilize the activity of cement, cement is too low, resulting in waste of cement and serious quality accidents. At present, the highway reinforced concrete bridges gradually move towards prefabrication and rapid construction, and the contractor hopes to arrive at the correct strength of concrete to ensure the project quality