北京——十三陵快速轨道交通工程、南起东三旗与北京地铁五号线终点站接驳换乘,向北经平西府、马坊、小汤山、百善村、沙河、白浮村、自行车赛场、昌平环岛至终点十三陵站。线路全长34.4公里,其中高架线路21.3公里,地面线路12.5公里,地下线路0.6公里。共设14座车站,其中地面站6座,高架站8座。为了停放和检修车辆,在起点和终点分别设置停车场和车辆段各一处(见封二图)。估算初期投资40.4亿元,初、近、远期总投资为51.2亿。
Beijing - the Ming Tombs rapid rail transit project, the East starting from the East and the Beijing Subway Line 5 terminal transfer transfer, north via Pingxi, Mafang, Xiaotangshan, Baoshan village, Shahe, white floating village, bicycle Stadium, Changping Island to the end of the Ming Tombs Station. The total length of 34.4 km line, of which 21.3 km overhead lines, 12.5 km of ground lines, 0.6 km underground lines. A total of 14 stations, including 6 ground stations, elevated station 8. In order to park and overhaul the vehicle, a parking lot and a car depot are set at the start and end, respectively (see the cover two). The estimated initial investment of 4.04 billion yuan, initial, near and long-term total investment of 5.12 billion.