本文通过对《山西省万家寨引黄一期工程联接段内外资概算》编制所采用的单价法与实物量法两种方法的比较分析 ,着重叙述了国际通用计算工程造价的方法即实物量法的编制方法 ,提出了利用外资建设的水利水电工程项目内外资概算编制同时采用两种方法 ,切实达到工程概算反映工程实际造价的目的。
This article compares and analyzes the two methods of the unit price method and the physical quantity method used in the compilation of the “Internal Estimates of Foreign Investment in the Linked Segment of the First Phase of the Yellow River Water Transfer Project of Wanjiazhai, Shanxi Province”, and focuses on the method of calculating the cost of the international general engineering project. The preparation method of the law proposes the use of foreign capital for the construction of water resources and hydropower projects. The preparation of both domestic and foreign investment budgets adopts two methods at the same time, and effectively achieves the purpose of reflecting the actual cost of the project based on the estimated project budget.