蒲石河抽水蓄能电站位于辽宁省丹东市宽甸满族自治县境内,电站总装机容量1200 MW,建成后并入东北电网,担任调峰、填谷、调频、调相和备用任务。年发电利用小时为1550 h,年抽水利用小时为2008 h。
Pushihe Pumped Storage Power Station is located in Kuandian Manchu Autonomous County, Dandong City, Liaoning Province. The total installed capacity of the power station is 1200 MW. Upon completion, it will be integrated into the Northeast Power Grid for peaking, filling, FM, phasing and standby tasks. The annual power generation utilization hour is 1550 h and the annual pumping utilization hour is 2008 h.