我公司河南水厂筹建于1958年,把厂建于南宁火力发电厂的旁边,修了一条不到200米长的管道,把电厂冷却水自流地引入平流式沉淀池,作为生活饮用水水源。这样,减少了河边取水泵房6万吨/日的泵组设备和一条直径为800毫米、长达1,200米的进水管道,为国家节省了基本建设投资费20余万 Our company Henan Water Plant was established in 1958. The plant was built next to the Nanning thermal power plant. A pipeline with a length of less than 200 meters was repaired. The cooling water from the power plant was introduced into the advection-type sedimentation basin as a drinking water source. In this way, the pumping equipment for the 60,000-ton/day pumping station at the riverside and a water inlet pipeline with a diameter of 800 millimeters and a length of 1,200 meters were reduced, saving the country a capital investment of over 200,000 yuan.
其他文献
本文根据粉煤灰的形成和收集方式,粉煤灰颗粒的特性,以及十三个电厂粉煤灰的资料说明清除粉煤灰中的粗颗粒,保证足够的细度,是改善粉煤灰混合材质量的主要途径。粗粉煤灰作混
一、赛璐璐水泥胶结剂1、配方: 赛璐璐:香焦水=1∶7,赛璐璐香焦水∶硅酸盐水泥=1∶1。2、配制:将赛璐璐按比例放入香焦水中浸泡24小时,搅拌后按重量比掺入一定水泥即成糊状
挡土墙用于维护边坡的稳定性,是山区建设中的一项重要工程。随着我国山区建设的发展,挡土墙工程日渐增多,其工程费用约占土建工程总投资百分之十左右,个别工程达到百分之三
我们在承担装配式大型壁板建筑的施工过程中,在毛主席革命路线的指引下,坚持“自力更生、艰苦奋斗”的方针,根据壁板工程的结构构造和施工工艺的特点,经过反复实践,不断革新
周恩来同志在中国共产党第十次全国代表大会上的政治报告中,号召我们:“要继续搞好批林整风。”“全党要认真学习马列著作和毛主席著作,坚持辩证唯物论和历史唯物论,反对唯
在毛主席革命路线指引下,我国液压工程起重机发展很快。从1960年北京起重机器厂设计制造我国第一台液压汽车起重机以来,特别是无产阶级文化大革命以来,液压汽车起重机的生产
国际标准化机构(ISO)127专门委员会的第一分科会(TC127/SCI)于1971年10月在伦敦开会讨论并制定土方机械(包括履带式牵引车、自卸卡车、铲运机、液压挖掘机、轮胎式装载机)性
3月21日,关中灌区绿化工作现场会在澄城县石堡川灌区召开。来自关中各大、中型灌区的代表在会议期间参观了石堡川灌区渠道绿化现场,交流了灌区绿化工作的经验。省水利厅副厅
近几年来我局以“四化”(装卸、养路、检修、施工机械化)为中心的群众性技术革新减轻体力劳动,提高工作效率和产品质量,降低成本等方面,取得显著收效,特别是机务、车辆部门,
前言开封火电厂为次高压凝汽式电厂,一期工程装机容量为2×5万瓩,锅炉补给水处理方式为一级除盐。其系统为: 、黄河水→预沉池一生水泵一澄清池一无阀滤池一清水箱一清水泵