继1963年在上海召开部属水利水电勘测设计院施工处(室)处长(主任)工作会议之后,1988年3月26日至4月1日,由水电部规划设计管理局主持在西安召开了第二次部属水利水电勘测设计施工处(室)处长(主任)工作会议。参加这次会议的有国际工程咨询公司、水电部建设局、部直属勘测设计院、以及甘肃、山西、四川、广西、福建勘测设计院等121个单位的代表。
Following the working conference held in 1963 by Director (Director) of the Construction Department (Room) of the Ministry of Water Resources and Hydropower Survey and Design Institute in Shanghai, from March 26 to April 1, 1988, the Planning and Design Authority of the Ministry of Electricity and Water was held in Xi’an The second subordinate water conservancy and hydropower survey design and construction office (room) director (director) work conference. Attend this meeting, there are international engineering consulting company, the Ministry of Construction, Ministry of Water Resources, Ministry directly under the Ministry of Survey and Design Institute, and Gansu, Shanxi, Sichuan, Guangxi, Fujian Survey and Design Institute and other units of 121 representatives.