论文部分内容阅读
对哈大高铁18号道岔接触网无交叉线岔的布置技术、受电弓通过线岔的工作原理进行了探讨,阐述了无交叉线岔施工注意事项。
On the layout technology of No-Crossed Crossover of Turnout of No 18 Turnout of Harbin-Dalian High-Speed Rail, the working principle of the pantograph through the bifurcation is discussed, and the precautions of the construction of the uncrossed bifurcation are expounded.