现行水利工程定额内容难以准确反映实际工程造价,也不利于向微机编制方向发展。因此,预算定额形式需要改进,内容需要优化。1 定额的形式目前的预算定额无论是部颁定额还是地方定额,其形式都是编列若干个子目,在编制预算时套用相应的子目。这种形式看似简便,但在简便的背后却包含着相当繁琐的工作。由于定额的子目相当多,调整定额需要花费巨大的人力、
The current quota of water conservancy projects is difficult to accurately reflect the actual cost of the project is not conducive to the direction of computer development. Therefore, the form of budget needs to be improved, the content needs to be optimized. 1 The form of quota The current budget The quota, whether denomination or local, is in the form of a number of sub-headings and the corresponding subheads are applied when preparing the budget. This form may seem simple, but behind the simple but contains a lot of tedious work. Due to the considerable number of subheadings, it takes a huge manpower to adjust the quota,